Market data

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
19. July 2018486,00
18. July 2018491,00
17. July 2018490,00
16. July 2018489,00
13. July 2018498,00
12. July 2018496,00
11. July 2018494,00
10. July 2018505,00
09. July 2018509,00
06. July 2018510,00
05. July 2018515,00
04. July 2018524,00
03. July 2018534,00
02. July 2018537,00
dateBrass MS 58, 1st processing level
29. June 2018541,00
28. June 2018543,00
27. June 2018543,00
26. June 2018541,00
25. June 2018549,00
22. June 2018552,00
21. June 2018558,00
20. June 2018559,00
19. June 2018559,00
18. June 2018568,00
15. June 2018582,00
14. June 2018575,00
13. June 2018579,00
12. June 2018577,00
11. June 2018579,00
08. June 2018582,00
07. June 2018578,00
06. June 2018575,00
05. June 2018567,00
04. June 2018560,00
01. June 2018553,00
dateBrass MS 58, 1st processing level
30. May 2018558,00
29. May 2018562,00
25. May 2018556,00
24. May 2018551,00
23. May 2018549,00
22. May 2018553,00
18. May 2018547,00
17. May 2018549,00
16. May 2018545,00
15. May 2018543,00
14. May 2018539,00
11. May 2018545,00
10. May 2018543,00
09. May 2018543,00
08. May 2018539,00
04. May 2018534,00
03. May 2018537,00
02. May 2018537,00
dateBrass MS 58, 1st processing level
30. April 2018537,00
27. April 2018536,00
26. April 2018536,00
25. April 2018541,00
24. April 2018546,00
23. April 2018540,00
20. April 2018539,00
19. April 2018536,00
18. April 2018534,00
17. April 2018523,00
16. April 2018525,00
13. April 2018528,00
12. April 2018523,00
11. April 2018535,00
10. April 2018535,00
09. April 2018530,00
06. April 2018528,00
05. April 2018533,00
04. April 2018525,00
03. April 2018534,00
dateBrass MS 58, 1st processing level
29. March 2018530,00
28. March 2018521,00
27. March 2018524,00
26. March 2018513,00
23. March 2018523,00
22. March 2018529,00
21. March 2018527,00
20. March 2018533,00
19. March 2018534,00
16. March 2018541,00
15. March 2018536,00
14. March 2018544,00
13. March 2018538,00
12. March 2018538,00
09. March 2018533,00
08. March 2018536,00
07. March 2018535,00
06. March 2018543,00
05. March 2018539,00
02. March 2018544,00
01. March 2018548,00
dateBrass MS 58, 1st processing level
28. Febuary 2018556,00
27. Febuary 2018558,00
26. Febuary 2018563,00
23. Febuary 2018561,00
22. Febuary 2018558,00
21. Febuary 2018557,00
20. Febuary 2018558,00
19. Febuary 2018558,00
16. Febuary 2018560,00
15. Febuary 2018557,00
14. Febuary 2018552,00
13. Febuary 2018547,00
12. Febuary 2018542,00
09. Febuary 2018542,00
08. Febuary 2018547,00
07. Febuary 2018555,00
06. Febuary 2018556,00
05. Febuary 2018554,00
02. Febuary 2018554,00
01. Febuary 2018554,00
dateBrass MS 58, 1st processing level
31. January 2018557,00
30. January 2018555,00
29. January 2018559,00
26. January 2018554,00
25. January 2018556,00
24. January 2018548,00
23. January 2018551,00
22. January 2018557,00
19. January 2018559,00
18. January 2018556,00
17. January 2018559,00
16. January 2018557,00
15. January 2018565,00
12. January 2018563,00
11. January 2018575,00
10. January 2018571,00
09. January 2018573,00
08. January 2018570,00
05. January 2018567,00
04. January 2018572,00
03. January 2018568,00
02. January 2018570,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
29. December 2017569,00
22. December 2017565,00
21. December 2017561,00
20. December 2017560,00
19. December 2017555,00
18. December 2017556,00
15. December 2017549,00
14. December 2017547,00
13. December 2017548,00
12. December 2017543,00
11. December 2017536,00
08. December 2017537,00
07. December 2017535,00
06. December 2017536,00
05. December 2017540,00
04. December 2017553,00
01. December 2017546,00
dateBrass MS 58, 1st processing level
30. November 2017549,00
29. November 2017547,00
28. November 2017549,00
27. November 2017553,00
24. November 2017563,00
23. November 2017559,00
22. November 2017563,00
21. November 2017559,00
20. November 2017552,00
17. November 2017549,00
16. November 2017553,00
15. November 2017546,00
14. November 2017559,00
13. November 2017560,00
10. November 2017565,00
09. November 2017561,00
08. November 2017565,00
07. November 2017571,00
06. November 2017573,00
03. November 2017570,00
02. November 2017566,00
dateBrass MS 58, 1st processing level
30. October 2017565,00
27. October 2017563,00
26. October 2017566,00
25. October 2017566,00
24. October 2017574,00
23. October 2017564,00
20. October 2017566,00
19. October 2017558,00
18. October 2017565,00
17. October 2017564,00
16. October 2017571,00
13. October 2017558,00
12. October 2017554,00
11. October 2017547,00
10. October 2017547,00
09. October 2017548,00
06. October 2017551,00
05. October 2017543,00
04. October 2017539,00
02. October 2017535,00
dateBrass MS 58, 1st processing level
29. September 2017533,00
28. September 2017527,00
27. September 2017530,00
26. September 2017528,00
25. September 2017524,00
22. September 2017517,00
21. September 2017520,00
20. September 2017524,00
19. September 2017521,00
18. September 2017522,00
15. September 2017518,00
14. September 2017516,00
13. September 2017521,00
12. September 2017527,00
11. September 2017534,00
08. September 2017532,00
07. September 2017540,00
06. September 2017544,00
05. September 2017552,00
04. September 2017549,00
01. September 2017542,00
dateBrass MS 58, 1st processing level
31. August 2017545,00
30. August 2017538,00
29. August 2017536,00
25. August 2017541,00
24. August 2017534,00
23. August 2017534,00
22. August 2017538,00
21. August 2017534,00
18. August 2017530,00
17. August 2017531,00
16. August 2017526,00
15. August 2017518,00
14. August 2017513,00
11. August 2017514,00
10. August 2017521,00
09. August 2017524,00
08. August 2017512,00
07. August 2017509,00
04. August 2017505,00
03. August 2017504,00
02. August 2017503,00
01. August 2017504,00
dateBrass MS 58, 1st processing level
31. July 2017512,00
28. July 2017508,00
27. July 2017512,00
26. July 2017509,00
25. July 2017504,00
24. July 2017494,00
21. July 2017493,00
20. July 2017494,00
19. July 2017496,00
18. July 2017494,00
17. July 2017502,00
14. July 2017495,00
13. July 2017501,00
12. July 2017498,00
11. July 2017492,00
10. July 2017492,00
07. July 2017493,00
06. July 2017495,00
05. July 2017497,00
04. July 2017497,00
03. July 2017499,00
dateBrass MS 58, 1st processing level
30. June 2017498,00
29. June 2017498,00
28. June 2017494,00
27. June 2017496,00
26. June 2017498,00
23. June 2017499,00
22. June 2017495,00
21. June 2017486,00
20. June 2017486,00
19. June 2017484,00
16. June 2017482,00
14. June 2017481,00
13. June 2017478,00
12. June 2017486,00
09. June 2017486,00
08. June 2017477,00
07. June 2017473,00
06. June 2017471,00
02. June 2017474,00
01. June 2017480,00
dateBrass MS 58, 1st processing level
31. May 2017480,00
30. May 2017498,00
26. May 2017487,00
24. May 2017487,00
23. May 2017485,00
22. May 2017486,00
19. May 2017481,00
18. May 2017471,00
17. May 2017482,00
16. May 2017483,00
15. May 2017489,00
12. May 2017490,00
11. May 2017496,00
10. May 2017490,00
09. May 2017490,00
08. May 2017483,00
05. May 2017487,00
04. May 2017489,00
03. May 2017497,00
02. May 2017505,00
dateBrass MS 58, 1st processing level
28. April 2017500,00
27. April 2017501,00
26. April 2017500,00
25. April 2017499,00
24. April 2017497,00
21. April 2017503,00
20. April 2017502,00
19. April 2017500,00
18. April 2017506,00
13. April 2017509,00
12. April 2017513,00
11. April 2017517,00
10. April 2017521,00
07. April 2017518,00
06. April 2017528,00
05. April 2017523,00
04. April 2017516,00
03. April 2017523,00
dateBrass MS 58, 1st processing level
31. March 2017526,00
30. March 2017526,00
29. March 2017522,00
28. March 2017512,00
27. March 2017519,00
24. March 2017516,00
23. March 2017519,00
22. March 2017513,00
21. March 2017517,00
20. March 2017528,00
17. March 2017528,00
16. March 2017530,00
15. March 2017527,00
14. March 2017518,00
13. March 2017521,00
10. March 2017517,00
09. March 2017513,00
08. March 2017524,00
07. March 2017525,00
06. March 2017529,00
03. March 2017537,00
02. March 2017546,00
01. March 2017549,00
dateBrass MS 58, 1st processing level
28. Febuary 2017536,00
27. Febuary 2017537,00
24. Febuary 2017533,00
23. Febuary 2017544,00
22. Febuary 2017546,00
21. Febuary 2017549,00
20. Febuary 2017542,00
17. Febuary 2017535,00
16. Febuary 2017541,00
15. Febuary 2017547,00
14. Febuary 2017554,00
13. Febuary 2017553,00
10. Febuary 2017535,00
09. Febuary 2017530,00
08. Febuary 2017530,00
07. Febuary 2017523,00
06. Febuary 2017518,00
03. Febuary 2017523,00
02. Febuary 2017526,00
01. Febuary 2017528,00
dateBrass MS 58, 1st processing level
31. January 2017530,00
30. January 2017527,00
27. January 2017524,00
26. January 2017528,00
25. January 2017523,00
24. January 2017526,00
23. January 2017518,00
20. January 2017516,00
19. January 2017516,00
18. January 2017514,00
17. January 2017515,00
16. January 2017529,00
13. January 2017521,00
12. January 2017518,00
11. January 2017520,00
10. January 2017515,00
09. January 2017505,00
06. January 2017501,00
05. January 2017511,00
04. January 2017503,00
03. January 2017510,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2016498,00
29. December 2016503,00
28. December 2016504,00
23. December 2016503,00
22. December 2016498,00
21. December 2016507,00
20. December 2016508,00
19. December 2016512,00
16. December 2016521,00
15. December 2016526,00
14. December 2016517,00
13. December 2016521,00
12. December 2016519,00
09. December 2016525,00
08. December 2016518,00
07. December 2016528,00
06. December 2016520,00
05. December 2016521,00
02. December 2016514,00
01. December 2016521,00
dateBrass MS 58, 1st processing level
30. November 2016516,00
29. November 2016529,00
28. November 2016540,00
25. November 2016527,00
24. November 2016525,00
23. November 2016500,00
22. November 2016504,00
21. November 2016497,00
18. November 2016490,00
17. November 2016482,00
16. November 2016488,00
15. November 2016485,00
14. November 2016494,00
11. November 2016508,00
10. November 2016489,00
09. November 2016450,00
08. November 2016443,00
07. November 2016442,00
04. November 2016435,00
03. November 2016434,00
02. November 2016430,00
dateBrass MS 58, 1st processing level
31. October 2016432,00
28. October 2016429,00
27. October 2016427,00
26. October 2016423,00
25. October 2016426,00
24. October 2016416,00
21. October 2016416,00
20. October 2016414,00
19. October 2016413,00
18. October 2016415,00
17. October 2016415,00
14. October 2016413,00
13. October 2016417,00
12. October 2016422,00
11. October 2016420,00
10. October 2016418,00
07. October 2016416,00
06. October 2016415,00
05. October 2016418,00
04. October 2016422,00
dateBrass MS 58, 1st processing level
30. September 2016424,00
29. September 2016419,00
28. September 2016417,00
27. September 2016414,00
26. September 2016412,00
23. September 2016415,00
22. September 2016416,00
21. September 2016414,00
20. September 2016412,00
19. September 2016410,00
16. September 2016408,00
15. September 2016408,00
14. September 2016406,00
13. September 2016404,00
12. September 2016400,00
09. September 2016403,00
08. September 2016402,00
07. September 2016407,00
06. September 2016408,00
05. September 2016409,00
02. September 2016407,00
01. September 2016409,00
dateBrass MS 58, 1st processing level
31. August 2016408,00
30. August 2016407,00
29. August 2016435,00
26. August 2016403,00
25. August 2016403,00
24. August 2016405,00
23. August 2016407,00
22. August 2016408,00
19. August 2016410,00
18. August 2016412,00
17. August 2016410,00
16. August 2016412,00
15. August 2016411,00
12. August 2016412,00
11. August 2016418,00
10. August 2016422,00
09. August 2016418,00
08. August 2016419,00
05. August 2016416,00
04. August 2016416,00
03. August 2016421,00
02. August 2016421,00
01. August 2016423,00
dateBrass MS 58, 1st processing level
29. July 2016419,00
28. July 2016420,00
27. July 2016425,00
26. July 2016424,00
25. July 2016430,00
22. July 2016431,00
21. July 2016431,00
20. July 2016427,00
19. July 2016427,00
18. July 2016420,00
15. July 2016424,00
14. July 2016422,00
13. July 2016423,00
12. July 2016416,00
11. July 2016412,00
08. July 2016408,00
07. July 2016408,00
06. July 2016405,00
05. July 2016413,00
04. July 2016420,00
01. July 2016411,00
dateBrass MS 58, 1st processing level
30. June 2016412,00
29. June 2016409,00
28. June 2016408,00
27. June 2016404,00
24. June 2016398,00
23. June 2016395,00
22. June 2016396,00
21. June 2016386,00
20. June 2016386,00
17. June 2016384,00
16. June 2016386,00
15. June 2016394,00
14. June 2016386,00
13. June 2016386,00
10. June 2016386,00
09. June 2016386,00
08. June 2016387,00
07. June 2016386,00
06. June 2016394,00
03. June 2016399,00
02. June 2016391,00
01. June 2016389,00
dateBrass MS 58, 1st processing level
31. May 2016396,00
27. May 2016396,00
25. May 2016388,00
24. May 2016387,00
23. May 2016383,00
20. May 2016388,00
19. May 2016385,00
18. May 2016384,00
17. May 2016384,00
13. May 2016385,00
12. May 2016390,00
11. May 2016390,00
10. May 2016387,00
09. May 2016388,00
06. May 2016409,00
04. May 2016394,00
03. May 2016396,00
dateBrass MS 58, 1st processing level
29. April 2016409,00
28. April 2016400,00
27. April 2016403,00
26. April 2016404,00
25. April 2016409,00
22. April 2016411,00
21. April 2016411,00
20. April 2016403,00
19. April 2016396,00
18. April 2016395,00
15. April 2016396,00
14. April 2016398,00
13. April 2016396,00
12. April 2016383,00
11. April 2016377,00
08. April 2016379,00
07. April 2016383,00
06. April 2016388,00
05. April 2016389,00
04. April 2016393,00
01. April 2016395,00
dateBrass MS 58, 1st processing level
31. March 2016393,00
30. March 2016400,00
29. March 2016403,00
24. March 2016405,00
23. March 2016415,00
22. March 2016414,00
21. March 2016412,00
18. March 2016414,00
17. March 2016406,00
16. March 2016407,00
15. March 2016406,00
14. March 2016412,00
11. March 2016408,00
10. March 2016412,00
09. March 2016413,00
08. March 2016415,00
07. March 2016420,00
04. March 2016413,00
03. March 2016411,00
02. March 2016408,00
01. March 2016402,00
dateBrass MS 58, 1st processing level
29. Febuary 2016401,00
26. Febuary 2016393,00
25. Febuary 2016392,00
24. Febuary 2016388,00
23. Febuary 2016393,00
22. Febuary 2016395,00
19. Febuary 2016384,00
18. Febuary 2016381,00
17. Febuary 2016378,00
16. Febuary 2016380,00
15. Febuary 2016378,00
12. Febuary 2016371,00
11. Febuary 2016369,00
10. Febuary 2016373,00
09. Febuary 2016376,00
08. Febuary 2016380,00
05. Febuary 2016385,00
04. Febuary 2016386,00
03. Febuary 2016388,00
02. Febuary 2016389,00
01. Febuary 2016384,00
dateBrass MS 58, 1st processing level
29. January 2016382,00
28. January 2016382,00
27. January 2016381,00
26. January 2016380,00
25. January 2016376,00
22. January 2016377,00
21. January 2016366,00
20. January 2016365,00
19. January 2016374,00
18. January 2016366,00
15. January 2016362,00
14. January 2016365,00
13. January 2016368,00
12. January 2016366,00
11. January 2016368,00
08. January 2016374,00
07. January 2016378,00
06. January 2016390,00
05. January 2016394,00
04. January 2016388,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
31. December 2015394,00
30. December 2015394,00
29. December 2015389,00
23. December 2015389,00
22. December 2015387,00
21. December 2015391,00
18. December 2015389,00
17. December 2015381,00
16. December 2015381,00
15. December 2015379,00
14. December 2015384,00
11. December 2015387,00
10. December 2015380,00
09. December 2015385,00
08. December 2015383,00
07. December 2015388,00
04. December 2015388,00
03. December 2015392,00
02. December 2015395,00
01. December 2015397,00
dateBrass MS 58, 1st processing level
30. November 2015397,00
27. November 2015399,00
26. November 2015402,00
25. November 2015393,00
24. November 2015390,00
23. November 2015388,00
20. November 2015400,00
19. November 2015390,00
18. November 2015397,00
17. November 2015400,00
16. November 2015403,00
13. November 2015405,00
12. November 2015410,00
11. November 2015414,00
10. November 2015415,00
09. November 2015418,00
06. November 2015415,00
05. November 2015418,00
04. November 2015425,00
03. November 2015421,00
02. November 2015420,00
dateBrass MS 58, 1st processing level
30. October 2015420,00
29. October 2015424,00
28. October 2015422,00
27. October 2015426,00
26. October 2015428,00
23. October 2015430,00
22. October 2015419,00
21. October 2015412,00
20. October 2015413,00
19. October 2015420,00
16. October 2015420,00
15. October 2015423,00
14. October 2015419,00
13. October 2015419,00
12. October 2015426,00
09. October 2015424,00
08. October 2015410,00
07. October 2015417,00
06. October 2015427,00
05. October 2015411,00
02. October 2015410,00
01. October 2015418,00
dateBrass MS 58, 1st processing level
30. September 2015407,00
29. September 2015401,00
28. September 2015398,00
25. September 2015409,00
24. September 2015403,00
23. September 2015410,00
22. September 2015410,00
21. September 2015415,00
18. September 2015417,00
17. September 2015422,00
16. September 2015425,00
15. September 2015418,00
14. September 2015422,00
11. September 2015426,00
10. September 2015433,00
09. September 2015433,00
08. September 2015426,00
07. September 2015420,00
04. September 2015419,00
03. September 2015423,00
02. September 2015411,00
01. September 2015412,00
dateBrass MS 58, 1st processing level
31. August 2015438,00
28. August 2015411,00
27. August 2015404,00
26. August 2015397,00
25. August 2015397,00
24. August 2015387,00
21. August 2015407,00
20. August 2015413,00
19. August 2015414,00
18. August 2015412,00
17. August 2015419,00
14. August 2015421,00
13. August 2015421,00
12. August 2015417,00
11. August 2015424,00
10. August 2015430,00
07. August 2015429,00
06. August 2015433,00
05. August 2015435,00
04. August 2015435,00
03. August 2015432,00
dateBrass MS 58, 1st processing level
31. July 2015435,00
30. July 2015438,00
29. July 2015440,00
28. July 2015436,00
27. July 2015430,00
24. July 2015438,00
23. July 2015446,00
22. July 2015449,00
21. July 2015461,00
20. July 2015458,00
17. July 2015460,00
16. July 2015464,00
15. July 2015464,00
14. July 2015455,00
13. July 2015460,00
10. July 2015451,00
09. July 2015459,00
08. July 2015445,00
07. July 2015452,00
06. July 2015459,00
03. July 2015472,00
02. July 2015474,00
01. July 2015472,00
dateBrass MS 58, 1st processing level
30. June 2015466,00
29. June 2015471,00
26. June 2015466,00
25. June 2015466,00
24. June 2015470,00
23. June 2015465,00
22. June 2015456,00
19. June 2015459,00
18. June 2015463,00
17. June 2015468,00
16. June 2015468,00
15. June 2015470,00
12. June 2015480,00
11. June 2015479,00
10. June 2015488,00
09. June 2015486,00
08. June 2015485,00
05. June 2015482,00
04. June 2015498,00
03. June 2015492,00
02. June 2015496,00
01. June 2015499,00
dateBrass MS 58, 1st processing level
29. May 2015507,00
28. May 2015511,00
27. May 2015509,00
26. May 2015511,00
22. May 2015502,00
21. May 2015507,00
20. May 2015508,00
19. May 2015509,00
18. May 2015508,00
15. May 2015509,00
13. May 2015517,00
12. May 2015522,00
11. May 2015520,00
08. May 2015522,00
07. May 2015518,00
06. May 2015522,00
05. May 2015528,00
04. May 2015538,00
dateBrass MS 58, 1st processing level
30. April 2015513,00
29. April 2015510,00
28. April 2015513,00
27. April 2015514,00
24. April 2015511,00
23. April 2015508,00
22. April 2015507,00
21. April 2015512,00
20. April 2015514,00
17. April 2015514,00
16. April 2015518,00
15. April 2015513,00
14. April 2015513,00
13. April 2015524,00
10. April 2015523,00
09. April 2015512,00
08. April 2015507,00
07. April 2015505,00
02. April 2015503,00
01. April 2015506,00
dateBrass MS 58, 1st processing level
31. March 2015509,00
30. March 2015509,00
27. March 2015509,00
26. March 2015510,00
25. March 2015503,00
24. March 2015503,00
23. March 2015505,00
20. March 2015499,00
19. March 2015494,00
18. March 2015489,00
17. March 2015493,00
16. March 2015503,00
13. March 2015502,00
12. March 2015499,00
11. March 2015496,00
10. March 2015489,00
09. March 2015485,00
06. March 2015483,00
05. March 2015480,00
04. March 2015479,00
03. March 2015476,00
02. March 2015477,00
dateBrass MS 58, 1st processing level
27. Febuary 2015476,00
26. Febuary 2015475,00
25. Febuary 2015467,00
24. Febuary 2015462,00
23. Febuary 2015458,00
20. Febuary 2015461,00
19. Febuary 2015460,00
18. Febuary 2015460,00
17. Febuary 2015456,00
16. Febuary 2015472,00
13. Febuary 2015463,00
12. Febuary 2015463,00
11. Febuary 2015461,00
10. Febuary 2015459,00
09. Febuary 2015464,00
06. Febuary 2015460,00
05. Febuary 2015453,00
04. Febuary 2015460,00
03. Febuary 2015474,00
02. Febuary 2015454,00
dateBrass MS 58, 1st processing level
30. January 2015451,00
29. January 2015444,00
28. January 2015449,00
27. January 2015457,00
26. January 2015454,00
23. January 2015462,00
22. January 2015455,00
21. January 2015448,00
20. January 2015456,00
19. January 2015449,00
16. January 2015448,00
15. January 2015447,00
14. January 2015438,00
13. January 2015456,00
12. January 2015470,00
09. January 2015472,00
08. January 2015485,00
07. January 2015479,00
06. January 2015478,00
05. January 2015478,00
02. January 2015478,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2014474,00
29. December 2014483,00
23. December 2014474,00
22. December 2014477,00
19. December 2014477,00
18. December 2014469,00
17. December 2014461,00
16. December 2014463,00
15. December 2014479,00
12. December 2014475,00
11. December 2014471,00
10. December 2014476,00
09. December 2014473,00
08. December 2014481,00
05. December 2014482,00
04. December 2014481,00
03. December 2014477,00
02. December 2014473,00
01. December 2014468,00
dateBrass MS 58, 1st processing level
28. November 2014476,00
27. November 2014483,00
26. November 2014486,00
25. November 2014490,00
24. November 2014493,00
21. November 2014496,00
20. November 2014483,00
19. November 2014485,00
18. November 2014484,00
17. November 2014489,00
14. November 2014487,00
13. November 2014491,00
12. November 2014491,00
11. November 2014488,00
10. November 2014489,00
07. November 2014490,00
06. November 2014483,00
05. November 2014483,00
04. November 2014487,00
03. November 2014494,00
dateBrass MS 58, 1st processing level
31. October 2014493,00
30. October 2014488,00
29. October 2014486,00
28. October 2014487,00
27. October 2014485,00
24. October 2014484,00
23. October 2014480,00
22. October 2014480,00
21. October 2014472,00
20. October 2014470,00
17. October 2014469,00
16. October 2014471,00
15. October 2014488,00
14. October 2014487,00
13. October 2014487,00
10. October 2014482,00
09. October 2014483,00
08. October 2014486,00
07. October 2014485,00
06. October 2014486,00
02. October 2014481,00
01. October 2014486,00
dateBrass MS 58, 1st processing level
30. September 2014486,00
29. September 2014481,00
26. September 2014481,00
25. September 2014482,00
24. September 2014476,00
23. September 2014476,00
22. September 2014476,00
19. September 2014481,00
18. September 2014483,00
17. September 2014483,00
16. September 2014480,00
15. September 2014478,00
12. September 2014479,00
11. September 2014478,00
10. September 2014480,00
09. September 2014487,00
08. September 2014493,00
05. September 2014489,00
04. September 2014482,00
03. September 2014479,00
02. September 2014482,00
01. September 2014480,00
dateBrass MS 58, 1st processing level
29. August 2014480,00
28. August 2014483,00
27. August 2014483,00
26. August 2014485,00
22. August 2014482,00
21. August 2014478,00
20. August 2014472,00
19. August 2014470,00
18. August 2014465,00
15. August 2014463,00
14. August 2014466,00
13. August 2014468,00
12. August 2014475,00
11. August 2014472,00
08. August 2014472,00
07. August 2014471,00
06. August 2014474,00
05. August 2014479,00
04. August 2014477,00
01. August 2014476,00
dateBrass MS 58, 1st processing level
31. July 2014482,00
30. July 2014477,00
29. July 2014479,00
28. July 2014480,00
25. July 2014482,00
24. July 2014479,00
23. July 2014474,00
22. July 2014473,00
21. July 2014466,00
18. July 2014467,00
17. July 2014467,00
16. July 2014472,00
15. July 2014468,00
14. July 2014471,00
11. July 2014471,00
10. July 2014467,00
09. July 2014472,00
08. July 2014472,00
07. July 2014468,00
04. July 2014470,00
03. July 2014466,00
02. July 2014458,00
01. July 2014455,00
dateBrass MS 58, 1st processing level
30. June 2014454,00
27. June 2014456,00
26. June 2014453,00
25. June 2014451,00
24. June 2014451,00
23. June 2014453,00
20. June 2014446,00
18. June 2014443,00
17. June 2014441,00
16. June 2014442,00
13. June 2014439,00
12. June 2014443,00
11. June 2014441,00
10. June 2014441,00
06. June 2014435,00
05. June 2014444,00
04. June 2014445,00
03. June 2014450,00
02. June 2014453,00
dateBrass MS 58, 1st processing level
30. May 2014453,00
29. May 2014455,00
28. May 2014455,00
27. May 2014453,00
23. May 2014453,00
22. May 2014449,00
21. May 2014442,00
20. May 2014447,00
19. May 2014455,00
16. May 2014447,00
15. May 2014449,00
14. May 2014454,00
13. May 2014444,00
12. May 2014444,00
09. May 2014434,00
08. May 2014425,00
07. May 2014427,00
06. May 2014429,00
05. May 2014438,00
02. May 2014428,00
dateBrass MS 58, 1st processing level
30. April 2014432,00
29. April 2014433,00
28. April 2014434,00
25. April 2014435,00
24. April 2014433,00
23. April 2014428,00
22. April 2014428,00
17. April 2014427,00
16. April 2014425,00
15. April 2014428,00
14. April 2014427,00
11. April 2014427,00
10. April 2014425,00
09. April 2014427,00
08. April 2014428,00
07. April 2014427,00
04. April 2014431,00
03. April 2014425,00
02. April 2014430,00
01. April 2014427,00
dateBrass MS 58, 1st processing level
31. March 2014427,00
28. March 2014431,00
27. March 2014425,00
26. March 2014424,00
25. March 2014423,00
24. March 2014421,00
21. March 2014422,00
20. March 2014417,00
19. March 2014413,00
18. March 2014414,00
17. March 2014420,00
14. March 2014418,00
13. March 2014416,00
12. March 2014419,00
11. March 2014433,00
10. March 2014431,00
07. March 2014442,00
06. March 2014454,00
05. March 2014459,00
04. March 2014453,00
03. March 2014452,00
dateBrass MS 58, 1st processing level
28. Febuary 2014455,00
27. Febuary 2014458,00
26. Febuary 2014456,00
25. Febuary 2014455,00
24. Febuary 2014456,00
21. Febuary 2014462,00
20. Febuary 2014460,00
19. Febuary 2014461,00
18. Febuary 2014462,00
17. Febuary 2014462,00
14. Febuary 2014459,00
13. Febuary 2014459,00
12. Febuary 2014462,00
11. Febuary 2014457,00
10. Febuary 2014462,00
07. Febuary 2014465,00
06. Febuary 2014460,00
05. Febuary 2014459,00
04. Febuary 2014460,00
03. Febuary 2014459,00
dateBrass MS 58, 1st processing level
31. January 2014458,00
30. January 2014459,00
29. January 2014461,00
28. January 2014462,00
27. January 2014462,00
24. January 2014461,00
23. January 2014468,00
22. January 2014474,00
21. January 2014475,00
20. January 2014474,00
17. January 2014474,00
16. January 2014473,00
15. January 2014470,00
14. January 2014471,00
13. January 2014467,00
10. January 2014468,00
09. January 2014467,00
08. January 2014473,00
07. January 2014471,00
06. January 2014470,00
03. January 2014470,00
02. January 2014475,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
31. December 2013474,00
30. December 2013471,00
27. December 2013467,00
23. December 2013466,00
20. December 2013466,00
19. December 2013461,00
18. December 2013460,00
17. December 2013462,00
16. December 2013459,00
13. December 2013459,00
12. December 2013457,00
11. December 2013455,00
10. December 2013455,00
09. December 2013453,00
06. December 2013452,00
05. December 2013455,00
04. December 2013448,00
03. December 2013446,00
02. December 2013451,00
dateBrass MS 58, 1st processing level
29. November 2013449,00
28. November 2013448,00
27. November 2013451,00
26. November 2013454,00
25. November 2013455,00
22. November 2013455,00
21. November 2013452,00
20. November 2013450,00
19. November 2013449,00
18. November 2013452,00
15. November 2013452,00
14. November 2013451,00
13. November 2013455,00
12. November 2013462,00
11. November 2013462,00
08. November 2013461,00
07. November 2013458,00
06. November 2013463,00
05. November 2013460,00
04. November 2013462,00
dateBrass MS 58, 1st processing level
31. October 2013461,00
30. October 2013460,00
29. October 2013457,00
28. October 2013452,00
25. October 2013450,00
24. October 2013451,00
23. October 2013456,00
22. October 2013462,00
21. October 2013459,00
18. October 2013459,00
17. October 2013457,00
16. October 2013458,00
15. October 2013461,00
14. October 2013460,00
11. October 2013455,00
10. October 2013455,00
09. October 2013457,00
08. October 2013459,00
07. October 2013455,00
04. October 2013454,00
02. October 2013456,00
01. October 2013460,00
dateBrass MS 58, 1st processing level
30. September 2013466,00
27. September 2013464,00
26. September 2013461,00
25. September 2013457,00
24. September 2013457,00
23. September 2013458,00
20. September 2013464,00
19. September 2013464,00
18. September 2013459,00
17. September 2013457,00
16. September 2013457,00
13. September 2013458,00
12. September 2013458,00
11. September 2013466,00
10. September 2013467,00
09. September 2013470,00
06. September 2013473,00
05. September 2013465,00
04. September 2013467,00
03. September 2013471,00
02. September 2013469,00
dateBrass MS 58, 1st processing level
30. August 2013465,00
29. August 2013471,00
28. August 2013470,00
27. August 2013474,00
23. August 2013473,00
22. August 2013475,00
21. August 2013469,00
20. August 2013471,00
19. August 2013473,00
16. August 2013476,00
15. August 2013471,00
14. August 2013475,00
13. August 2013473,00
12. August 2013472,00
09. August 2013466,00
08. August 2013461,00
07. August 2013450,00
06. August 2013458,00
05. August 2013454,00
02. August 2013461,00
01. August 2013458,00
dateBrass MS 58, 1st processing level
31. July 2013446,00
30. July 2013443,00
29. July 2013449,00
26. July 2013452,00
25. July 2013456,00
24. July 2013463,00
23. July 2013459,00
22. July 2013459,00
19. July 2013459,00
18. July 2013455,00
17. July 2013457,00
16. July 2013460,00
15. July 2013461,00
12. July 2013462,00
11. July 2013466,00
10. July 2013462,00
09. July 2013456,00
08. July 2013466,00
05. July 2013460,00
04. July 2013463,00
03. July 2013465,00
02. July 2013463,00
01. July 2013458,00
dateBrass MS 58, 1st processing level
28. June 2013446,00
27. June 2013447,00
26. June 2013446,00
25. June 2013444,00
24. June 2013439,00
21. June 2013444,00
20. June 2013446,00
19. June 2013449,00
18. June 2013449,00
17. June 2013458,00
14. June 2013455,00
13. June 2013455,00
12. June 2013459,00
11. June 2013457,00
10. June 2013463,00
07. June 2013472,00
06. June 2013479,00
05. June 2013487,00
04. June 2013482,00
03. June 2013484,00
dateBrass MS 58, 1st processing level
31. May 2013479,00
29. May 2013477,00
28. May 2013480,00
24. May 2013478,00
23. May 2013483,00
22. May 2013492,00
21. May 2013493,00
17. May 2013486,00
16. May 2013472,00
15. May 2013472,00
14. May 2013475,00
13. May 2013482,00
10. May 2013484,00
09. May 2013478,00
08. May 2013478,00
07. May 2013472,00
06. May 2013475,00
03. May 2013465,00
02. May 2013451,00
dateBrass MS 58, 1st processing level
30. April 2013466,00
29. April 2013466,00
26. April 2013469,00
25. April 2013465,00
24. April 2013461,00
23. April 2013454,00
22. April 2013456,00
19. April 2013460,00
18. April 2013460,00
17. April 2013463,00
16. April 2013472,00
15. April 2013467,00
12. April 2013488,00
11. April 2013487,00
10. April 2013491,00
09. April 2013489,00
08. April 2013488,00
05. April 2013487,00
04. April 2013489,00
03. April 2013492,00
02. April 2013493,00
dateBrass MS 58, 1st processing level
28. March 2013503,00
27. March 2013503,00
26. March 2013508,00
25. March 2013499,00
22. March 2013501,00
21. March 2013501,00
20. March 2013500,00
19. March 2013497,00
18. March 2013498,00
15. March 2013507,00
14. March 2013512,00
13. March 2013510,00
12. March 2013512,00
11. March 2013503,00
08. March 2013503,00
07. March 2013503,00
06. March 2013504,00
05. March 2013509,00
04. March 2013509,00
01. March 2013502,00
dateBrass MS 58, 1st processing level
28. Febuary 2013511,00
27. Febuary 2013513,00
26. Febuary 2013511,00
25. Febuary 2013508,00
22. Febuary 2013510,00
21. Febuary 2013511,00
20. Febuary 2013513,00
19. Febuary 2013518,00
18. Febuary 2013518,00
15. Febuary 2013526,00
14. Febuary 2013526,00
13. Febuary 2013522,00
12. Febuary 2013521,00
11. Febuary 2013526,00
08. Febuary 2013523,00
07. Febuary 2013517,00
06. Febuary 2013517,00
05. Febuary 2013519,00
04. Febuary 2013518,00
01. Febuary 2013511,00
dateBrass MS 58, 1st processing level
31. January 2013515,00
30. January 2013515,00
29. January 2013509,00
28. January 2013509,00
25. January 2013512,00
24. January 2013514,00
23. January 2013518,00
22. January 2013514,00
21. January 2013512,00
18. January 2013513,00
17. January 2013504,00
16. January 2013504,00
15. January 2013505,00
14. January 2013510,00
11. January 2013517,00
10. January 2013525,00
09. January 2013524,00
08. January 2013520,00
07. January 2013521,00
04. January 2013525,00
03. January 2013530,00
02. January 2013522,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
28. December 2012516,00
27. December 2012509,00
21. December 2012505,00
20. December 2012506,00
19. December 2012513,00
18. December 2012519,00
17. December 2012520,00
14. December 2012525,00
13. December 2012523,00
12. December 2012530,00
11. December 2012530,00
10. December 2012535,00
07. December 2012524,00
06. December 2012523,00
05. December 2012522,00
04. December 2012521,00
03. December 2012522,00
dateBrass MS 58, 1st processing level
30. November 2012522,00
29. November 2012517,00
28. November 2012512,00
27. November 2012514,00
26. November 2012512,00
23. November 2012508,00
22. November 2012510,00
21. November 2012512,00
20. November 2012514,00
19. November 2012512,00
16. November 2012508,00
15. November 2012509,00
14. November 2012512,00
13. November 2012510,00
12. November 2012511,00
09. November 2012506,00
08. November 2012509,00
07. November 2012508,00
06. November 2012508,00
05. November 2012504,00
02. November 2012511,00
dateBrass MS 58, 1st processing level
31. October 2012508,00
30. October 2012507,00
29. October 2012505,00
26. October 2012508,00
25. October 2012509,00
24. October 2012512,00
23. October 2012509,00
22. October 2012514,00
19. October 2012523,00
18. October 2012527,00
17. October 2012520,00
16. October 2012526,00
15. October 2012528,00
12. October 2012531,00
11. October 2012536,00
10. October 2012534,00
09. October 2012536,00
08. October 2012533,00
05. October 2012540,00
04. October 2012544,00
02. October 2012548,00
01. October 2012539,00
dateBrass MS 58, 1st processing level
28. September 2012544,00
27. September 2012540,00
26. September 2012539,00
25. September 2012543,00
24. September 2012538,00
21. September 2012542,00
20. September 2012539,00
19. September 2012544,00
18. September 2012535,00
17. September 2012536,00
14. September 2012543,00
13. September 2012530,00
12. September 2012533,00
11. September 2012536,00
10. September 2012533,00
07. September 2012526,00
06. September 2012518,00
05. September 2012516,00
04. September 2012517,00
03. September 2012517,00
dateBrass MS 58, 1st processing level
31. August 2012512,00
30. August 2012516,00
29. August 2012511,00
28. August 2012517,00
27. August 2012521,00
24. August 2012517,00
23. August 2012519,00
22. August 2012517,00
21. August 2012515,00
20. August 2012513,00
17. August 2012515,00
16. August 2012512,00
15. August 2012513,00
14. August 2012511,00
13. August 2012514,00
10. August 2012517,00
09. August 2012520,00
08. August 2012520,00
06. August 2012512,00
03. August 2012510,00
02. August 2012514,00
01. August 2012519,00
dateBrass MS 58, 1st processing level
31. July 2012526,00
30. July 2012523,00
27. July 2012523,00
26. July 2012523,00
25. July 2012522,00
24. July 2012522,00
23. July 2012520,00
20. July 2012530,00
19. July 2012536,00
18. July 2012529,00
17. July 2012532,00
16. July 2012533,00
13. July 2012536,00
12. July 2012526,00
11. July 2012522,00
10. July 2012524,00
09. July 2012521,00
06. July 2012528,00
05. July 2012528,00
04. July 2012523,00
03. July 2012526,00
02. July 2012517,00
dateBrass MS 58, 1st processing level
29. June 2012515,00
28. June 2012510,00
27. June 2012502,00
26. June 2012503,00
25. June 2012504,00
22. June 2012500,00
21. June 2012503,00
20. June 2012510,00
19. June 2012510,00
18. June 2012509,00
15. June 2012512,00
14. June 2012505,00
13. June 2012508,00
12. June 2012508,00
11. June 2012507,00
08. June 2012504,00
06. June 2012513,00
05. June 2012513,00
04. June 2012513,00
01. June 2012513,00
dateBrass MS 58, 1st processing level
31. May 2012520,00
30. May 2012520,00
29. May 2012523,00
25. May 2012522,00
24. May 2012519,00
23. May 2012514,00
22. May 2012519,00
21. May 2012520,00
18. May 2012523,00
16. May 2012518,00
15. May 2012520,00
14. May 2012525,00
11. May 2012529,00
10. May 2012534,00
09. May 2012527,00
08. May 2012535,00
07. May 2012541,00
04. May 2012534,00
03. May 2012535,00
02. May 2012540,00
dateBrass MS 58, 1st processing level
30. April 2012543,00
27. April 2012538,00
26. April 2012534,00
25. April 2012530,00
24. April 2012527,00
23. April 2012525,00
20. April 2012523,00
19. April 2012522,00
18. April 2012525,00
17. April 2012524,00
16. April 2012526,00
13. April 2012526,00
12. April 2012529,00
11. April 2012524,00
10. April 2012534,00
05. April 2012539,00
04. April 2012540,00
03. April 2012539,00
02. April 2012534,00
dateBrass MS 58, 1st processing level
30. March 2012535,00
29. March 2012531,00
28. March 2012535,00
27. March 2012536,00
26. March 2012539,00
23. March 2012535,00
22. March 2012534,00
21. March 2012539,00
20. March 2012540,00
19. March 2012549,00
16. March 2012555,00
15. March 2012549,00
14. March 2012547,00
13. March 2012549,00
12. March 2012541,00
09. March 2012536,00
08. March 2012535,00
07. March 2012532,00
06. March 2012536,00
05. March 2012544,00
02. March 2012547,00
01. March 2012542,00
dateBrass MS 58, 1st processing level
29. Febuary 2012540,00
28. Febuary 2012544,00
27. Febuary 2012532,00
24. Febuary 2012532,00
23. Febuary 2012534,00
22. Febuary 2012535,00
21. Febuary 2012533,00
20. Febuary 2012524,00
17. Febuary 2012536,00
16. Febuary 2012533,00
15. Febuary 2012539,00
14. Febuary 2012537,00
13. Febuary 2012543,00
10. Febuary 2012548,00
09. Febuary 2012544,00
08. Febuary 2012547,00
07. Febuary 2012539,00
06. Febuary 2012549,00
03. Febuary 2012537,00
02. Febuary 2012539,00
01. Febuary 2012540,00
dateBrass MS 58, 1st processing level
31. January 2012546,00
30. January 2012543,00
27. January 2012556,00
26. January 2012553,00
25. January 2012543,00
24. January 2012540,00
23. January 2012541,00
20. January 2012540,00
19. January 2012546,00
18. January 2012539,00
17. January 2012543,00
16. January 2012537,00
13. January 2012528,00
12. January 2012528,00
11. January 2012516,00
10. January 2012511,00
09. January 2012502,00
06. January 2012507,00
05. January 2012496,00
04. January 2012500,00
03. January 2012498,00
02. January 2012501,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2011502,00
29. December 2011494,00
28. December 2011494,00
23. December 2011499,00
22. December 2011495,00
21. December 2011485,00
20. December 2011478,00
19. December 2011481,00
16. December 2011484,00
15. December 2011481,00
14. December 2011486,00
13. December 2011492,00
12. December 2011492,00
09. December 2011497,00
08. December 2011498,00
07. December 2011500,00
06. December 2011496,00
05. December 2011500,00
02. December 2011501,00
01. December 2011496,00
dateBrass MS 58, 1st processing level
30. November 2011480,00
29. November 2011480,00
28. November 2011476,00
25. November 2011470,00
24. November 2011469,00
23. November 2011465,00
22. November 2011471,00
21. November 2011470,00
18. November 2011478,00
17. November 2011478,00
16. November 2011482,00
15. November 2011482,00
14. November 2011483,00
11. November 2011469,00
10. November 2011470,00
09. November 2011482,00
08. November 2011484,00
07. November 2011481,00
04. November 2011487,00
03. November 2011483,00
02. November 2011487,00
01. November 2011479,00
dateBrass MS 58, 1st processing level
31. October 2011479,00
28. October 2011477,00
27. October 2011483,00
26. October 2011471,00
25. October 2011464,00
24. October 2011458,00
21. October 2011444,00
20. October 2011434,00
19. October 2011454,00
18. October 2011457,00
17. October 2011470,00
14. October 2011467,00
13. October 2011459,00
12. October 2011463,00
11. October 2011457,00
10. October 2011463,00
07. October 2011463,00
06. October 2011459,00
05. October 2011446,00
04. October 2011448,00
dateBrass MS 58, 1st processing level
30. September 2011458,00
29. September 2011445,00
28. September 2011466,00
27. September 2011476,00
26. September 2011461,00
23. September 2011468,00
22. September 2011496,00
21. September 2011510,00
20. September 2011519,00
19. September 2011521,00
16. September 2011536,00
15. September 2011531,00
14. September 2011535,00
13. September 2011541,00
12. September 2011536,00
09. September 2011541,00
08. September 2011539,00
07. September 2011536,00
06. September 2011527,00
05. September 2011529,00
02. September 2011532,00
01. September 2011534,00
dateBrass MS 58, 1st processing level
31. August 2011534,00
30. August 2011532,00
29. August 2011530,00
26. August 2011528,00
25. August 2011518,00
24. August 2011514,00
23. August 2011515,00
22. August 2011513,00
19. August 2011516,00
18. August 2011515,00
17. August 2011516,00
16. August 2011513,00
15. August 2011519,00
12. August 2011523,00
11. August 2011520,00
10. August 2011517,00
09. August 2011519,00
08. August 2011528,00
05. August 2011543,00
04. August 2011554,00
03. August 2011556,00
02. August 2011567,00
01. August 2011568,00
dateBrass MS 58, 1st processing level
29. July 2011571,00
28. July 2011570,00
27. July 2011564,00
26. July 2011565,00
25. July 2011560,00
22. July 2011562,00
21. July 2011566,00
20. July 2011572,00
19. July 2011574,00
18. July 2011575,00
15. July 2011564,00
14. July 2011566,00
13. July 2011571,00
12. July 2011567,00
11. July 2011563,00
08. July 2011566,00
07. July 2011557,00
06. July 2011550,00
05. July 2011544,00
04. July 2011542,00
01. July 2011543,00
dateBrass MS 58, 1st processing level
30. June 2011538,00
29. June 2011532,00
28. June 2011529,00
27. June 2011531,00
24. June 2011535,00
22. June 2011525,00
21. June 2011527,00
20. June 2011525,00
17. June 2011532,00
16. June 2011534,00
15. June 2011536,00
14. June 2011525,00
10. June 2011523,00
09. June 2011517,00
08. June 2011516,00
07. June 2011520,00
06. June 2011523,00
03. June 2011523,00
01. June 2011532,00
dateBrass MS 58, 1st processing level
31. May 2011535,00
30. May 2011542,00
27. May 2011538,00
26. May 2011532,00
25. May 2011537,00
24. May 2011527,00
23. May 2011527,00
20. May 2011526,00
19. May 2011527,00
18. May 2011522,00
17. May 2011522,00
16. May 2011516,00
13. May 2011520,00
12. May 2011506,00
11. May 2011509,00
10. May 2011520,00
09. May 2011517,00
06. May 2011505,00
05. May 2011496,00
04. May 2011514,00
03. May 2011520,00
02. May 2011530,00
dateBrass MS 58, 1st processing level
29. April 2011530,00
28. April 2011524,00
27. April 2011529,00
26. April 2011536,00
21. April 2011546,00
20. April 2011542,00
19. April 2011542,00
18. April 2011547,00
15. April 2011545,00
14. April 2011542,00
13. April 2011554,00
12. April 2011558,00
11. April 2011564,00
08. April 2011567,00
07. April 2011566,00
06. April 2011553,00
05. April 2011548,00
04. April 2011554,00
01. April 2011551,00
dateBrass MS 58, 1st processing level
31. March 2011551,00
30. March 2011561,00
29. March 2011557,00
28. March 2011564,00
25. March 2011569,00
24. March 2011569,00
23. March 2011569,00
22. March 2011551,00
21. March 2011557,00
18. March 2011559,00
17. March 2011559,00
16. March 2011558,00
15. March 2011541,00
14. March 2011550,00
11. March 2011549,00
10. March 2011554,00
09. March 2011572,00
08. March 2011563,00
07. March 2011581,00
04. March 2011592,00
03. March 2011592,00
02. March 2011589,00
01. March 2011595,00
dateBrass MS 58, 1st processing level
28. Febuary 2011592,00
25. Febuary 2011585,00
24. Febuary 2011573,00
23. Febuary 2011577,00
22. Febuary 2011589,00
21. Febuary 2011598,00
18. Febuary 2011602,00
17. Febuary 2011600,00
16. Febuary 2011607,00
15. Febuary 2011616,00
14. Febuary 2011621,00
11. Febuary 2011605,00
10. Febuary 2011597,00
09. Febuary 2011605,00
08. Febuary 2011600,00
07. Febuary 2011614,00
04. Febuary 2011602,00
03. Febuary 2011594,00
02. Febuary 2011592,00
01. Febuary 2011587,00
dateBrass MS 58, 1st processing level
31. January 2011583,00
28. January 2011573,00
27. January 2011566,00
26. January 2011562,00
25. January 2011562,00
24. January 2011576,00
21. January 2011578,00
20. January 2011579,00
19. January 2011598,00
18. January 2011599,00
17. January 2011604,00
14. January 2011593,00
13. January 2011605,00
12. January 2011613,00
11. January 2011605,00
10. January 2011601,00
07. January 2011600,00
06. January 2011615,00
05. January 2011592,00
04. January 2011602,00
03. January 2011605,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2010600,00
29. December 2010598,00
28. December 2010585,00
27. December 2010589,00
23. December 2010587,00
22. December 2010593,00
21. December 2010589,00
20. December 2010580,00
17. December 2010566,00
16. December 2010564,00
15. December 2010565,00
14. December 2010569,00
13. December 2010575,00
10. December 2010570,00
09. December 2010567,00
08. December 2010559,00
07. December 2010562,00
06. December 2010550,00
03. December 2010549,00
02. December 2010551,00
01. December 2010542,00
dateBrass MS 58, 1st processing level
30. November 2010536,00
29. November 2010528,00
26. November 2010525,00
25. November 2010521,00
24. November 2010518,00
23. November 2010504,00
22. November 2010513,00
19. November 2010512,00
18. November 2010514,00
17. November 2010507,00
16. November 2010525,00
15. November 2010531,00
12. November 2010538,00
11. November 2010550,00
10. November 2010539,00
09. November 2010537,00
08. November 2010529,00
05. November 2010524,00
04. November 2010511,00
03. November 2010510,00
02. November 2010512,00
01. November 2010513,00
dateBrass MS 58, 1st processing level
29. October 2010508,00
28. October 2010516,00
27. October 2010518,00
26. October 2010521,00
25. October 2010520,00
22. October 2010513,00
21. October 2010512,00
20. October 2010509,00
19. October 2010508,00
18. October 2010510,00
15. October 2010506,00
14. October 2010509,00
13. October 2010511,00
12. October 2010508,00
11. October 2010506,00
08. October 2010495,00
07. October 2010501,00
06. October 2010504,00
05. October 2010501,00
04. October 2010500,00
01. October 2010499,00
dateBrass MS 58, 1st processing level
30. September 2010499,00
29. September 2010499,00
28. September 2010496,00
27. September 2010500,00
24. September 2010503,00
23. September 2010503,00
22. September 2010490,00
21. September 2010499,00
20. September 2010503,00
17. September 2010504,00
16. September 2010499,00
15. September 2010500,00
14. September 2010501,00
13. September 2010508,00
10. September 2010506,00
09. September 2010506,00
08. September 2010512,00
07. September 2010505,00
06. September 2010507,00
03. September 2010507,00
02. September 2010508,00
01. September 2010502,00
dateBrass MS 58, 1st processing level
31. August 2010496,00
30. August 2010493,00
27. August 2010490,00
26. August 2010485,00
25. August 2010478,00
24. August 2010486,00
23. August 2010488,00
20. August 2010487,00
19. August 2010496,00
18. August 2010490,00
17. August 2010489,00
16. August 2010483,00
13. August 2010483,00
12. August 2010480,00
11. August 2010475,00
10. August 2010472,00
09. August 2010481,00
06. August 2010483,00
05. August 2010479,00
04. August 2010478,00
03. August 2010476,00
02. August 2010479,00
dateBrass MS 58, 1st processing level
30. July 2010473,00
29. July 2010471,00
28. July 2010468,00
27. July 2010466,00
26. July 2010463,00
23. July 2010462,00
22. July 2010462,00
21. July 2010453,00
20. July 2010435,00
19. July 2010432,00
16. July 2010439,00
15. July 2010445,00
14. July 2010451,00
13. July 2010450,00
12. July 2010453,00
09. July 2010452,00
08. July 2010450,00
07. July 2010447,00
06. July 2010446,00
05. July 2010442,00
02. July 2010442,00
01. July 2010443,00
dateBrass MS 58, 1st processing level
30. June 2010453,00
29. June 2010461,00
28. June 2010471,00
25. June 2010461,00
24. June 2010456,00
23. June 2010458,00
22. June 2010451,00
21. June 2010456,00
18. June 2010438,00
17. June 2010448,00
16. June 2010459,00
15. June 2010461,00
14. June 2010460,00
11. June 2010456,00
10. June 2010448,00
09. June 2010453,00
08. June 2010439,00
07. June 2010440,00
04. June 2010451,00
02. June 2010462,00
01. June 2010473,00
dateBrass MS 58, 1st processing level
31. May 2010486,00
28. May 2010476,00
27. May 2010477,00
26. May 2010474,00
25. May 2010469,00
21. May 2010456,00
20. May 2010454,00
19. May 2010458,00
18. May 2010460,00
17. May 2010472,00
14. May 2010486,00
12. May 2010481,00
11. May 2010469,00
10. May 2010475,00
07. May 2010465,00
06. May 2010471,00
05. May 2010456,00
04. May 2010474,00
03. May 2010479,00
dateBrass MS 58, 1st processing level
30. April 2010479,00
29. April 2010485,00
28. April 2010486,00
27. April 2010497,00
26. April 2010503,00
23. April 2010497,00
22. April 2010497,00
21. April 2010495,00
20. April 2010497,00
19. April 2010491,00
16. April 2010505,00
15. April 2010500,00
14. April 2010500,00
13. April 2010496,00
12. April 2010499,00
09. April 2010505,00
08. April 2010502,00
07. April 2010508,00
06. April 2010508,00
01. April 2010501,00
dateBrass MS 58, 1st processing level
31. March 2010499,00
30. March 2010496,00
29. March 2010487,00
26. March 2010481,00
25. March 2010475,00
24. March 2010472,00
23. March 2010474,00
22. March 2010468,00
19. March 2010476,00
18. March 2010473,00
17. March 2010471,00
16. March 2010465,00
15. March 2010463,00
12. March 2010471,00
11. March 2010470,00
10. March 2010480,00
09. March 2010474,00
08. March 2010479,00
05. March 2010474,00
04. March 2010473,00
03. March 2010473,00
02. March 2010469,00
01. March 2010467,00
dateBrass MS 58, 1st processing level
26. Febuary 2010452,00
25. Febuary 2010453,00
24. Febuary 2010451,00
23. Febuary 2010469,00
22. Febuary 2010469,00
19. Febuary 2010464,00
18. Febuary 2010457,00
17. Febuary 2010454,00
16. Febuary 2010446,00
15. Febuary 2010441,00
12. Febuary 2010438,00
11. Febuary 2010428,00
10. Febuary 2010424,00
09. Febuary 2010417,00
08. Febuary 2010409,00
05. Febuary 2010403,00
04. Febuary 2010418,00
03. Febuary 2010429,00
02. Febuary 2010431,00
01. Febuary 2010422,00
dateBrass MS 58, 1st processing level
29. January 2010429,00
28. January 2010438,00
27. January 2010448,00
26. January 2010452,00
25. January 2010455,00
22. January 2010449,00
21. January 2010460,00
20. January 2010462,00
19. January 2010457,00
18. January 2010457,00
15. January 2010452,00
14. January 2010452,00
13. January 2010447,00
12. January 2010451,00
11. January 2010464,00
08. January 2010459,00
07. January 2010468,00
06. January 2010474,00
05. January 2010455,00
04. January 2010459,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2009456,00
29. December 2009448,00
23. December 2009437,00
22. December 2009430,00
21. December 2009432,00
18. December 2009426,00
17. December 2009427,00
16. December 2009424,00
15. December 2009415,00
14. December 2009418,00
11. December 2009412,00
10. December 2009410,00
09. December 2009416,00
08. December 2009416,00
07. December 2009414,00
04. December 2009413,00
03. December 2009414,00
02. December 2009414,00
01. December 2009401,00
dateBrass MS 58, 1st processing level
30. November 2009401,00
27. November 2009401,00
26. November 2009404,00
25. November 2009405,00
24. November 2009405,00
23. November 2009409,00
20. November 2009401,00
19. November 2009402,00
18. November 2009408,00
17. November 2009402,00
16. November 2009397,00
13. November 2009388,00
12. November 2009385,00
11. November 2009389,00
10. November 2009384,00
09. November 2009390,00
06. November 2009391,00
05. November 2009392,00
04. November 2009396,00
03. November 2009390,00
02. November 2009390,00
dateBrass MS 58, 1st processing level
30. October 2009395,00
29. October 2009391,00
28. October 2009393,00
27. October 2009397,00
26. October 2009398,00
23. October 2009395,00
22. October 2009392,00
21. October 2009379,00
20. October 2009382,00
19. October 2009373,00
16. October 2009369,00
15. October 2009364,00
14. October 2009369,00
13. October 2009378,00
12. October 2009377,00
09. October 2009378,00
08. October 2009375,00
07. October 2009366,00
06. October 2009364,00
05. October 2009357,00
02. October 2009360,00
01. October 2009371,00
dateBrass MS 58, 1st processing level
30. September 2009371,00
29. September 2009363,00
28. September 2009358,00
25. September 2009361,00
24. September 2009365,00
23. September 2009366,00
22. September 2009375,00
21. September 2009367,00
18. September 2009373,00
17. September 2009377,00
16. September 2009377,00
15. September 2009370,00
14. September 2009371,00
11. September 2009379,00
10. September 2009384,00
09. September 2009389,00
08. September 2009392,00
07. September 2009386,00
04. September 2009387,00
03. September 2009385,00
02. September 2009375,00
01. September 2009386,00
dateBrass MS 58, 1st processing level
28. August 2009391,00
27. August 2009383,00
26. August 2009384,00
25. August 2009383,00
24. August 2009387,00
21. August 2009375,00
20. August 2009377,00
19. August 2009371,00
18. August 2009379,00
17. August 2009379,00
14. August 2009390,00
13. August 2009393,00
12. August 2009374,00
11. August 2009381,00
10. August 2009384,00
07. August 2009367,00
06. August 2009372,00
05. August 2009375,00
04. August 2009364,00
03. August 2009369,00
dateBrass MS 58, 1st processing level
31. July 2009361,00
30. July 2009348,00
29. July 2009341,00
28. July 2009350,00
27. July 2009350,00
24. July 2009347,00
23. July 2009343,00
22. July 2009337,00
21. July 2009336,00
20. July 2009340,00
17. July 2009331,00
16. July 2009330,00
15. July 2009328,00
14. July 2009321,00
13. July 2009315,00
10. July 2009315,00
09. July 2009313,00
08. July 2009317,00
07. July 2009324,00
06. July 2009317,00
03. July 2009323,00
02. July 2009322,00
01. July 2009323,00
dateBrass MS 58, 1st processing level
30. June 2009325,00
29. June 2009326,00
26. June 2009327,00
25. June 2009327,00
24. June 2009316,00
23. June 2009314,00
22. June 2009316,00
19. June 2009326,00
18. June 2009319,00
17. June 2009321,00
16. June 2009329,00
15. June 2009331,00
12. June 2009339,00
11. June 2009338,00
10. June 2009332,00
09. June 2009329,00
08. June 2009323,00
05. June 2009322,00
04. June 2009312,00
03. June 2009315,00
02. June 2009319,00
01. June 2009315,00
dateBrass MS 58, 1st processing level
29. May 2009309,00
28. May 2009304,00
27. May 2009305,00
26. May 2009301,00
25. May 2009306,00
22. May 2009301,00
20. May 2009305,00
19. May 2009311,00
18. May 2009303,00
15. May 2009298,00
14. May 2009295,00
13. May 2009303,00
12. May 2009313,00
11. May 2009308,00
08. May 2009325,00
07. May 2009329,00
06. May 2009318,00
05. May 2009318,00
04. May 2009311,00
dateBrass MS 58, 1st processing level
30. April 2009311,00
29. April 2009299,00
28. April 2009297,00
27. April 2009301,00
24. April 2009303,00
23. April 2009318,00
22. April 2009316,00
21. April 2009313,00
20. April 2009327,00
17. April 2009330,00
16. April 2009330,00
15. April 2009325,00
14. April 2009314,00
09. April 2009306,00
08. April 2009297,00
07. April 2009298,00
06. April 2009293,00
03. April 2009284,00
02. April 2009284,00
01. April 2009277,00
dateBrass MS 58, 1st processing level
31. March 2009281,00
30. March 2009275,00
27. March 2009276,00
26. March 2009278,00
25. March 2009268,00
24. March 2009268,00
23. March 2009272,00
20. March 2009270,00
19. March 2009255,00
18. March 2009256,00
17. March 2009259,00
16. March 2009254,00
13. March 2009256,00
12. March 2009247,00
11. March 2009256,00
10. March 2009260,00
09. March 2009255,00
06. March 2009261,00
05. March 2009259,00
04. March 2009254,00
03. March 2009247,00
02. March 2009238,00
dateBrass MS 58, 1st processing level
27. Febuary 2009240,00
26. Febuary 2009243,00
25. Febuary 2009237,00
24. Febuary 2009227,00
23. Febuary 2009228,00
20. Febuary 2009227,00
19. Febuary 2009236,00
18. Febuary 2009229,00
17. Febuary 2009235,00
16. Febuary 2009233,00
13. Febuary 2009240,00
12. Febuary 2009237,00
11. Febuary 2009236,00
10. Febuary 2009240,00
09. Febuary 2009245,00
06. Febuary 2009242,00
05. Febuary 2009237,00
04. Febuary 2009236,00
03. Febuary 2009228,00
02. Febuary 2009226,00
dateBrass MS 58, 1st processing level
30. January 2009223,00
29. January 2009219,00
28. January 2009226,00
27. January 2009229,00
26. January 2009231,00
23. January 2009221,00
22. January 2009223,00
21. January 2009229,00
20. January 2009233,00
19. January 2009230,00
16. January 2009232,00
15. January 2009227,00
14. January 2009229,00
13. January 2009220,00
12. January 2009220,00
09. January 2009221,00
08. January 2009218,00
07. January 2009230,00
06. January 2009232,00
05. January 2009214,00
02. January 2009230,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2008210,00
23. December 2008216,00
22. December 2008202,00
19. December 2008197,00
18. December 2008190,00
17. December 2008202,00
16. December 2008214,00
15. December 2008220,00
12. December 2008217,00
11. December 2008233,00
10. December 2008235,00
09. December 2008234,00
08. December 2008234,00
05. December 2008233,00
04. December 2008252,00
03. December 2008255,00
02. December 2008261,00
01. December 2008265,00
dateBrass MS 58, 1st processing level
28. November 2008262,00
27. November 2008265,00
26. November 2008270,00
25. November 2008260,00
24. November 2008272,00
21. November 2008261,00
20. November 2008258,00
19. November 2008264,00
18. November 2008261,00
17. November 2008263,00
14. November 2008272,00
13. November 2008267,00
12. November 2008264,00
11. November 2008265,00
10. November 2008279,00
07. November 2008269,00
06. November 2008273,00
05. November 2008282,00
04. November 2008278,00
03. November 2008278,00
dateBrass MS 58, 1st processing level
31. October 2008282,00
30. October 2008302,00
29. October 2008305,00
28. October 2008294,00
27. October 2008271,00
24. October 2008269,00
23. October 2008278,00
22. October 2008294,00
21. October 2008296,00
20. October 2008311,00
17. October 2008302,00
16. October 2008312,00
15. October 2008323,00
14. October 2008346,00
13. October 2008325,00
10. October 2008321,00
09. October 2008340,00
08. October 2008348,00
07. October 2008361,00
06. October 2008358,00
03. October 2008371,00
02. October 2008378,00
01. October 2008378,00
dateBrass MS 58, 1st processing level
30. September 2008375,00
29. September 2008384,00
26. September 2008396,00
25. September 2008392,00
24. September 2008396,00
23. September 2008397,00
22. September 2008407,00
19. September 2008402,00
18. September 2008396,00
16. September 2008400,00
15. September 2008402,00
12. September 2008418,00
11. September 2008410,00
10. September 2008403,00
09. September 2008404,00
08. September 2008407,00
05. September 2008411,00
04. September 2008422,00
03. September 2008418,00
02. September 2008410,00
01. September 2008414,00
dateBrass MS 58, 1st processing level
29. August 2008415,00
28. August 2008423,00
27. August 2008421,00
26. August 2008423,00
25. August 2008438,00
22. August 2008430,00
21. August 2008431,00
20. August 2008422,00
19. August 2008414,00
18. August 2008410,00
15. August 2008404,00
14. August 2008413,00
13. August 2008400,00
12. August 2008398,00
11. August 2008404,00
08. August 2008405,00
07. August 2008409,00
06. August 2008411,00
05. August 2008408,00
04. August 2008411,00
01. August 2008421,00
dateBrass MS 58, 1st processing level
31. July 2008429,00
30. July 2008419,00
29. July 2008417,00
28. July 2008419,00
25. July 2008418,00
24. July 2008426,00
23. July 2008427,00
22. July 2008427,00
21. July 2008424,00
18. July 2008421,00
17. July 2008420,00
16. July 2008417,00
15. July 2008427,00
14. July 2008433,00
11. July 2008437,00
10. July 2008433,00
09. July 2008426,00
08. July 2008435,00
07. July 2008436,00
04. July 2008438,00
03. July 2008446,00
02. July 2008442,00
01. July 2008440,00
dateBrass MS 58, 1st processing level
30. June 2008443,00
27. June 2008442,00
26. June 2008437,00
25. June 2008439,00
24. June 2008438,00
23. June 2008442,00
20. June 2008442,00
19. June 2008436,00
18. June 2008433,00
17. June 2008426,00
16. June 2008429,00
13. June 2008424,00
12. June 2008419,00
11. June 2008419,00
10. June 2008422,00
09. June 2008418,00
06. June 2008423,00
05. June 2008421,00
04. June 2008423,00
03. June 2008422,00
02. June 2008419,00
dateBrass MS 58, 1st processing level
30. May 2008427,00
29. May 2008426,00
28. May 2008428,00
27. May 2008435,00
26. May 2008438,00
23. May 2008438,00
21. May 2008438,00
20. May 2008440,00
19. May 2008451,00
16. May 2008454,00
15. May 2008446,00
14. May 2008441,00
13. May 2008450,00
12. May 2008446,00
09. May 2008446,00
08. May 2008453,00
07. May 2008460,00
06. May 2008456,00
02. May 2008447,00
01. May 2008456,00
dateBrass MS 58, 1st processing level
30. April 2008456,00
29. April 2008459,00
28. April 2008458,00
25. April 2008452,00
24. April 2008452,00
23. April 2008449,00
22. April 2008450,00
21. April 2008446,00
18. April 2008447,00
17. April 2008456,00
16. April 2008450,00
15. April 2008452,00
14. April 2008450,00
11. April 2008457,00
10. April 2008460,00
09. April 2008454,00
08. April 2008455,00
07. April 2008459,00
04. April 2008452,00
03. April 2008455,00
02. April 2008448,00
01. April 2008441,00
dateBrass MS 58, 1st processing level
31. March 2008446,00
28. March 2008447,00
27. March 2008443,00
26. March 2008437,00
25. March 2008441,00
20. March 2008424,00
19. March 2008439,00
18. March 2008441,00
17. March 2008446,00
14. March 2008466,00
13. March 2008464,00
12. March 2008456,00
11. March 2008465,00
10. March 2008461,00
07. March 2008473,00
06. March 2008491,00
05. March 2008471,00
04. March 2008486,00
03. March 2008481,00
dateBrass MS 58, 1st processing level
29. Febuary 2008478,00
28. Febuary 2008476,00
27. Febuary 2008478,00
26. Febuary 2008468,00
25. Febuary 2008469,00
22. Febuary 2008471,00
21. Febuary 2008474,00
20. Febuary 2008463,00
19. Febuary 2008461,00
18. Febuary 2008457,00
15. Febuary 2008450,00
14. Febuary 2008451,00
13. Febuary 2008447,00
12. Febuary 2008457,00
11. Febuary 2008457,00
08. Febuary 2008445,00
07. Febuary 2008431,00
06. Febuary 2008425,00
05. Febuary 2008425,00
04. Febuary 2008427,00
01. Febuary 2008428,00
dateBrass MS 58, 1st processing level
31. January 2008417,00
30. January 2008417,00
29. January 2008417,00
28. January 2008404,00
25. January 2008416,00
24. January 2008415,00
23. January 2008414,00
22. January 2008408,00
21. January 2008413,00
18. January 2008415,00
17. January 2008418,00
16. January 2008409,00
15. January 2008417,00
14. January 2008424,00
11. January 2008419,00
10. January 2008421,00
09. January 2008434,00
08. January 2008423,00
07. January 2008414,00
04. January 2008419,00
03. January 2008406,00
02. January 2008401,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
31. December 2007405,00
28. December 2007405,00
27. December 2007419,00
21. December 2007407,00
20. December 2007403,00
19. December 2007393,00
18. December 2007388,00
17. December 2007391,00
14. December 2007394,00
13. December 2007394,00
12. December 2007396,00
11. December 2007399,00
10. December 2007403,00
07. December 2007408,00
06. December 2007401,00
05. December 2007395,00
04. December 2007392,00
03. December 2007414,00
dateBrass MS 58, 1st processing level
30. November 2007416,00
29. November 2007408,00
28. November 2007392,00
27. November 2007391,00
26. November 2007397,00
23. November 2007391,00
22. November 2007384,00
21. November 2007387,00
20. November 2007394,00
19. November 2007413,00
16. November 2007415,00
15. November 2007427,00
14. November 2007426,00
13. November 2007426,00
12. November 2007417,00
09. November 2007428,00
08. November 2007438,00
07. November 2007448,00
06. November 2007453,00
05. November 2007451,00
02. November 2007456,00
01. November 2007469,00
dateBrass MS 58, 1st processing level
31. October 2007469,00
30. October 2007468,00
29. October 2007482,00
26. October 2007479,00
25. October 2007476,00
24. October 2007477,00
23. October 2007486,00
22. October 2007477,00
19. October 2007487,00
18. October 2007490,00
17. October 2007495,00
16. October 2007503,00
15. October 2007511,00
12. October 2007504,00
11. October 2007509,00
10. October 2007505,00
09. October 2007499,00
08. October 2007497,00
05. October 2007511,00
04. October 2007516,00
03. October 2007506,00
02. October 2007506,00
01. October 2007501,00
dateBrass MS 58, 1st processing level
28. September 2007503,00
27. September 2007505,00
26. September 2007502,00
25. September 2007493,00
24. September 2007498,00
21. September 2007496,00
20. September 2007493,00
19. September 2007494,00
18. September 2007478,00
17. September 2007480,00
14. September 2007478,00
13. September 2007473,00
12. September 2007471,00
11. September 2007472,00
10. September 2007465,00
07. September 2007478,00
06. September 2007471,00
05. September 2007487,00
04. September 2007483,00
03. September 2007491,00
dateBrass MS 58, 1st processing level
31. August 2007497,00
30. August 2007488,00
29. August 2007487,00
28. August 2007489,00
24. August 2007488,00
23. August 2007494,00
22. August 2007486,00
21. August 2007477,00
20. August 2007487,00
17. August 2007473,00
16. August 2007488,00
15. August 2007502,00
14. August 2007516,00
13. August 2007513,00
10. August 2007501,00
09. August 2007507,00
08. August 2007515,00
07. August 2007518,00
06. August 2007514,00
03. August 2007529,00
02. August 2007536,00
01. August 2007531,00
dateBrass MS 58, 1st processing level
31. July 2007540,00
30. July 2007525,00
27. July 2007527,00
26. July 2007532,00
25. July 2007534,00
24. July 2007543,00
23. July 2007544,00
20. July 2007538,00
19. July 2007530,00
18. July 2007522,00
17. July 2007522,00
16. July 2007526,00
13. July 2007527,00
12. July 2007534,00
11. July 2007528,00
10. July 2007529,00
09. July 2007534,00
06. July 2007527,00
05. July 2007526,00
04. July 2007528,00
03. July 2007524,00
02. July 2007519,00
dateBrass MS 58, 1st processing level
29. June 2007514,00
28. June 2007513,00
27. June 2007503,00
26. June 2007515,00
25. June 2007505,00
22. June 2007519,00
21. June 2007523,00
20. June 2007527,00
19. June 2007522,00
18. June 2007535,00
15. June 2007527,00
14. June 2007523,00
13. June 2007516,00
12. June 2007518,00
11. June 2007522,00
08. June 2007515,00
07. June 2007525,00
06. June 2007525,00
05. June 2007532,00
04. June 2007526,00
01. June 2007525,00
dateBrass MS 58, 1st processing level
31. May 2007520,00
30. May 2007511,00
29. May 2007511,00
25. May 2007505,00
24. May 2007516,00
23. May 2007508,00
22. May 2007530,00
21. May 2007521,00
18. May 2007510,00
16. May 2007533,00
15. May 2007541,00
14. May 2007550,00
11. May 2007550,00
10. May 2007559,00
09. May 2007568,00
08. May 2007567,00
04. May 2007566,00
03. May 2007548,00
02. May 2007548,00
dateBrass MS 58, 1st processing level
30. April 2007529,00
27. April 2007526,00
26. April 2007534,00
25. April 2007531,00
24. April 2007552,00
23. April 2007537,00
20. April 2007542,00
19. April 2007536,00
18. April 2007542,00
17. April 2007530,00
16. April 2007536,00
13. April 2007527,00
12. April 2007536,00
11. April 2007543,00
10. April 2007535,00
05. April 2007514,00
04. April 2007504,00
03. April 2007498,00
02. April 2007482,00
dateBrass MS 58, 1st processing level
30. March 2007486,00
29. March 2007472,00
28. March 2007473,00
27. March 2007481,00
26. March 2007482,00
23. March 2007479,00
22. March 2007473,00
21. March 2007471,00
20. March 2007473,00
19. March 2007470,00
16. March 2007463,00
15. March 2007466,00
14. March 2007454,00
13. March 2007461,00
12. March 2007453,00
09. March 2007453,00
08. March 2007460,00
07. March 2007449,00
06. March 2007448,00
05. March 2007435,00
02. March 2007449,00
01. March 2007460,00
dateBrass MS 58, 1st processing level
28. Febuary 2007451,00
27. Febuary 2007461,00
26. Febuary 2007470,00
23. Febuary 2007466,00
22. Febuary 2007449,00
21. Febuary 2007427,00
20. Febuary 2007433,00
19. Febuary 2007426,00
16. Febuary 2007440,00
15. Febuary 2007440,00
14. Febuary 2007426,00
13. Febuary 2007423,00
12. Febuary 2007413,00
09. Febuary 2007408,00
08. Febuary 2007397,00
07. Febuary 2007406,00
06. Febuary 2007409,00
05. Febuary 2007407,00
02. Febuary 2007416,00
01. Febuary 2007430,00
dateBrass MS 58, 1st processing level
31. January 2007434,00
30. January 2007433,00
29. January 2007435,00
26. January 2007445,00
25. January 2007452,00
24. January 2007446,00
23. January 2007437,00
22. January 2007434,00
19. January 2007432,00
18. January 2007442,00
17. January 2007439,00
16. January 2007447,00
15. January 2007450,00
12. January 2007461,00
11. January 2007455,00
10. January 2007443,00
09. January 2007434,00
08. January 2007438,00
05. January 2007457,00
04. January 2007449,00
03. January 2007453,00
02. January 2007475,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
29. December 2006497,00
28. December 2006500,00
27. December 2006502,00
22. December 2006486,00
21. December 2006492,00
20. December 2006492,00
19. December 2006508,00
18. December 2006511,00
15. December 2006514,00
14. December 2006507,00
13. December 2006507,00
12. December 2006516,00
11. December 2006515,00
08. December 2006509,00
07. December 2006509,00
06. December 2006523,00
05. December 2006527,00
04. December 2006522,00
01. December 2006522,00
dateBrass MS 58, 1st processing level
30. November 2006520,00
29. November 2006518,00
28. November 2006528,00
27. November 2006534,00
24. November 2006535,00
23. November 2006532,00
22. November 2006537,00
21. November 2006528,00
20. November 2006524,00
17. November 2006513,00
16. November 2006530,00
15. November 2006519,00
14. November 2006534,00
13. November 2006517,00
10. November 2006542,00
09. November 2006556,00
08. November 2006560,00
07. November 2006566,00
06. November 2006558,00
03. November 2006553,00
02. November 2006549,00
dateBrass MS 58, 1st processing level
31. October 2006560,00
30. October 2006553,00
27. October 2006563,00
26. October 2006558,00
25. October 2006558,00
24. October 2006556,00
23. October 2006564,00
20. October 2006565,00
19. October 2006564,00
18. October 2006564,00
17. October 2006572,00
16. October 2006562,00
13. October 2006554,00
12. October 2006551,00
11. October 2006546,00
10. October 2006545,00
09. October 2006547,00
06. October 2006530,00
05. October 2006518,00
04. October 2006528,00
03. October 2006523,00
02. October 2006537,00
dateBrass MS 58, 1st processing level
29. September 2006536,00
28. September 2006539,00
27. September 2006543,00
26. September 2006531,00
25. September 2006511,00
22. September 2006527,00
21. September 2006521,00
20. September 2006503,00
19. September 2006517,00
18. September 2006512,00
15. September 2006513,00
14. September 2006517,00
13. September 2006524,00
12. September 2006523,00
11. September 2006526,00
08. September 2006546,00
07. September 2006553,00
06. September 2006547,00
05. September 2006540,00
04. September 2006527,00
01. September 2006524,00
dateBrass MS 58, 1st processing level
31. August 2006519,00
30. August 2006512,00
29. August 2006510,00
28. August 2006528,00
25. August 2006518,00
24. August 2006524,00
23. August 2006522,00
22. August 2006519,00
21. August 2006516,00
18. August 2006512,00
17. August 2006516,00
16. August 2006516,00
15. August 2006527,00
14. August 2006522,00
11. August 2006540,00
10. August 2006547,00
09. August 2006536,00
08. August 2006531,00
07. August 2006527,00
04. August 2006533,00
03. August 2006536,00
02. August 2006532,00
01. August 2006538,00
dateBrass MS 58, 1st processing level
31. July 2006536,00
28. July 2006526,00
27. July 2006521,00
26. July 2006516,00
25. July 2006517,00
24. July 2006504,00
21. July 2006518,00
20. July 2006531,00
19. July 2006529,00
18. July 2006549,00
17. July 2006555,00
14. July 2006565,00
13. July 2006552,00
12. July 2006565,00
11. July 2006551,00
10. July 2006528,00
07. July 2006533,00
06. July 2006518,00
05. July 2006518,00
04. July 2006516,00
03. July 2006506,00
dateBrass MS 58, 1st processing level
30. June 2006519,00
29. June 2006497,00
28. June 2006489,00
27. June 2006488,00
26. June 2006484,00
23. June 2006470,00
22. June 2006492,00
21. June 2006475,00
20. June 2006480,00
19. June 2006486,00
16. June 2006499,00
14. June 2006474,00
13. June 2006484,00
12. June 2006511,00
09. June 2006523,00
08. June 2006527,00
07. June 2006518,00
06. June 2006532,00
02. June 2006548,00
01. June 2006537,00
dateBrass MS 58, 1st processing level
31. May 2006560,00
30. May 2006577,00
29. May 2006583,00
26. May 2006581,00
24. May 2006547,00
23. May 2006541,00
22. May 2006519,00
19. May 2006539,00
18. May 2006555,00
17. May 2006575,00
16. May 2006562,00
15. May 2006551,00
12. May 2006593,00
11. May 2006595,00
10. May 2006557,00
09. May 2006539,00
08. May 2006523,00
05. May 2006541,00
04. May 2006528,00
03. May 2006507,00
02. May 2006517,00
dateBrass MS 58, 1st processing level
28. April 2006507,00
27. April 2006514,00
26. April 2006528,00
25. April 2006515,00
24. April 2006499,00
21. April 2006493,00
20. April 2006477,00
19. April 2006482,00
18. April 2006487,00
13. April 2006466,00
12. April 2006457,00
11. April 2006452,00
10. April 2006446,00
07. April 2006437,00
06. April 2006428,00
05. April 2006425,00
04. April 2006421,00
03. April 2006422,00
dateBrass MS 58, 1st processing level
31. March 2006416,00
30. March 2006410,00
29. March 2006406,00
28. March 2006405,00
27. March 2006404,00
24. March 2006402,00
23. March 2006397,00
22. March 2006388,00
21. March 2006393,00
20. March 2006382,00
17. March 2006378,00
16. March 2006370,00
15. March 2006372,00
14. March 2006369,00
13. March 2006369,00
10. March 2006363,00
09. March 2006366,00
08. March 2006359,00
07. March 2006369,00
06. March 2006373,00
03. March 2006376,00
02. March 2006378,00
01. March 2006366,00
dateBrass MS 58, 1st processing level
28. Febuary 2006367,00
27. Febuary 2006365,00
24. Febuary 2006370,00
23. Febuary 2006366,00
22. Febuary 2006372,00
21. Febuary 2006366,00
20. Febuary 2006360,00
17. Febuary 2006362,00
16. Febuary 2006353,00
15. Febuary 2006366,00
14. Febuary 2006369,00
13. Febuary 2006364,00
10. Febuary 2006373,00
09. Febuary 2006377,00
08. Febuary 2006371,00
07. Febuary 2006382,00
06. Febuary 2006378,00
03. Febuary 2006376,00
02. Febuary 2006371,00
01. Febuary 2006365,00
dateBrass MS 58, 1st processing level
31. January 2006364,00
30. January 2006363,00
27. January 2006358,00
26. January 2006353,00
25. January 2006349,00
24. January 2006341,00
23. January 2006340,00
20. January 2006345,00
19. January 2006346,00
18. January 2006340,00
17. January 2006340,00
16. January 2006342,00
13. January 2006340,00
12. January 2006335,00
11. January 2006337,00
10. January 2006338,00
09. January 2006337,00
06. January 2006333,00
05. January 2006334,00
04. January 2006336,00
03. January 2006332,00
02. January 2006344,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2005344,00
29. December 2005343,00
28. December 2005343,00
23. December 2005335,00
22. December 2005332,00
21. December 2005331,00
20. December 2005329,00
19. December 2005329,00
16. December 2005329,00
15. December 2005319,00
14. December 2005327,00
13. December 2005329,00
12. December 2005333,00
09. December 2005335,00
08. December 2005334,00
07. December 2005335,00
06. December 2005329,00
05. December 2005332,00
02. December 2005331,00
01. December 2005325,00
dateBrass MS 58, 1st processing level
30. November 2005320,00
29. November 2005316,00
28. November 2005318,00
25. November 2005316,00
24. November 2005313,00
23. November 2005306,00
22. November 2005316,00
21. November 2005315,00
18. November 2005321,00
17. November 2005317,00
16. November 2005313,00
15. November 2005316,00
14. November 2005310,00
11. November 2005311,00
10. November 2005303,00
09. November 2005303,00
08. November 2005300,00
07. November 2005300,00
04. November 2005298,00
03. November 2005293,00
02. November 2005291,00
01. November 2005291,00
dateBrass MS 58, 1st processing level
31. October 2005291,00
28. October 2005282,00
27. October 2005287,00
26. October 2005291,00
25. October 2005288,00
24. October 2005286,00
21. October 2005285,00
20. October 2005296,00
19. October 2005293,00
18. October 2005293,00
17. October 2005286,00
14. October 2005281,00
13. October 2005287,00
12. October 2005290,00
11. October 2005288,00
10. October 2005288,00
07. October 2005283,00
06. October 2005285,00
05. October 2005282,00
04. October 2005281,00
03. October 2005277,00
dateBrass MS 58, 1st processing level
30. September 2005277,00
29. September 2005277,00
28. September 2005280,00
27. September 2005279,00
26. September 2005279,00
23. September 2005277,00
22. September 2005274,00
21. September 2005271,00
20. September 2005268,00
19. September 2005259,00
16. September 2005259,00
15. September 2005259,00
14. September 2005263,00
13. September 2005263,00
12. September 2005261,00
09. September 2005256,00
08. September 2005262,00
07. September 2005263,00
06. September 2005266,00
05. September 2005262,00
02. September 2005266,00
01. September 2005263,00
dateBrass MS 58, 1st processing level
31. August 2005269,00
30. August 2005269,00
26. August 2005262,00
25. August 2005261,00
24. August 2005265,00
23. August 2005265,00
22. August 2005263,00
19. August 2005263,00
18. August 2005261,00
17. August 2005261,00
16. August 2005260,00
15. August 2005258,00
12. August 2005254,00
11. August 2005250,00
10. August 2005252,00
09. August 2005250,00
08. August 2005255,00
05. August 2005259,00
04. August 2005258,00
03. August 2005258,00
02. August 2005260,00
01. August 2005257,00
dateBrass MS 58, 1st processing level
29. July 2005261,00
28. July 2005257,00
27. July 2005257,00
26. July 2005257,00
25. July 2005256,00
22. July 2005252,00
21. July 2005255,00
20. July 2005253,00
19. July 2005252,00
18. July 2005252,00
15. July 2005248,00
14. July 2005250,00
13. July 2005249,00
12. July 2005250,00
11. July 2005254,00
08. July 2005254,00
07. July 2005246,00
06. July 2005249,00
05. July 2005246,00
04. July 2005245,00
01. July 2005246,00
dateBrass MS 58, 1st processing level
30. June 2005252,00
29. June 2005249,00
28. June 2005250,00
27. June 2005252,00
24. June 2005255,00
23. June 2005248,00
22. June 2005250,00
21. June 2005254,00
20. June 2005254,00
17. June 2005250,00
16. June 2005249,00
15. June 2005249,00
14. June 2005249,00
13. June 2005249,00
10. June 2005245,00
09. June 2005242,00
08. June 2005241,00
07. June 2005246,00
06. June 2005246,00
03. June 2005245,00
02. June 2005235,00
01. June 2005230,00
dateBrass MS 58, 1st processing level
31. May 2005227,00
30. May 2005227,00
27. May 2005228,00
25. May 2005226,00
24. May 2005226,00
23. May 2005220,00
20. May 2005221,00
19. May 2005221,00
18. May 2005219,00
17. May 2005216,00
13. May 2005220,00
12. May 2005222,00
11. May 2005224,00
10. May 2005225,00
09. May 2005226,00
06. May 2005223,00
04. May 2005220,00
03. May 2005224,00
02. May 2005224,00
dateBrass MS 58, 1st processing level
29. April 2005224,00
28. April 2005224,00
27. April 2005225,00
26. April 2005227,00
25. April 2005225,00
22. April 2005226,00
21. April 2005224,00
20. April 2005229,00
19. April 2005225,00
18. April 2005222,00
15. April 2005224,00
14. April 2005220,00
13. April 2005227,00
12. April 2005233,00
11. April 2005233,00
08. April 2005233,00
07. April 2005232,00
06. April 2005230,00
05. April 2005228,00
04. April 2005228,00
01. April 2005229,00
dateBrass MS 58, 1st processing level
31. March 2005230,00
30. March 2005227,00
29. March 2005228,00
24. March 2005226,00
23. March 2005227,00
22. March 2005225,00
21. March 2005225,00
18. March 2005222,00
17. March 2005225,00
16. March 2005225,00
15. March 2005222,00
14. March 2005222,00
11. March 2005222,00
10. March 2005222,00
09. March 2005223,00
08. March 2005226,00
07. March 2005224,00
04. March 2005226,00
03. March 2005222,00
02. March 2005221,00
01. March 2005224,00
dateBrass MS 58, 1st processing level
28. Febuary 2005224,00
25. Febuary 2005223,00
24. Febuary 2005222,00
23. Febuary 2005222,00
22. Febuary 2005224,00
21. Febuary 2005224,00
18. Febuary 2005224,00
17. Febuary 2005220,00
16. Febuary 2005220,00
15. Febuary 2005219,00
14. Febuary 2005219,00
11. Febuary 2005220,00
10. Febuary 2005219,00
09. Febuary 2005217,00
08. Febuary 2005218,00
07. Febuary 2005217,00
04. Febuary 2005216,00
03. Febuary 2005214,00
02. Febuary 2005216,00
01. Febuary 2005217,00
dateBrass MS 58, 1st processing level
31. January 2005219,00
28. January 2005218,00
27. January 2005216,00
26. January 2005217,00
25. January 2005215,00
24. January 2005216,00
21. January 2005216,00
20. January 2005214,00
19. January 2005211,00
18. January 2005209,00
17. January 2005211,00
14. January 2005208,00
13. January 2005208,00
12. January 2005208,00
11. January 2005209,00
10. January 2005209,00
07. January 2005207,00
06. January 2005205,00
05. January 2005203,00
04. January 2005204,00
03. January 2005218,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2004206,00
29. December 2004206,00
28. December 2004204,00
27. December 2004202,00
23. December 2004203,00
22. December 2004210,00
21. December 2004207,00
20. December 2004205,00
17. December 2004205,00
16. December 2004204,00
15. December 2004202,00
14. December 2004201,00
13. December 2004200,00
10. December 2004198,00
09. December 2004195,00
08. December 2004195,00
07. December 2004201,00
06. December 2004199,00
03. December 2004203,00
02. December 2004207,00
01. December 2004208,00
dateBrass MS 58, 1st processing level
30. November 2004209,00
29. November 2004210,00
26. November 2004206,00
25. November 2004210,00
24. November 2004211,00
23. November 2004210,00
22. November 2004206,00
19. November 2004208,00
18. November 2004209,00
17. November 2004205,00
16. November 2004206,00
15. November 2004205,00
12. November 2004206,00
11. November 2004203,00
10. November 2004203,00
09. November 2004202,00
08. November 2004204,00
05. November 2004201,00
04. November 2004201,00
03. November 2004200,00
02. November 2004199,00
dateBrass MS 58, 1st processing level
29. October 2004198,00
28. October 2004192,00
27. October 2004194,00
26. October 2004192,00
25. October 2004194,00
22. October 2004198,00
21. October 2004199,00
20. October 2004198,00
19. October 2004199,00
18. October 2004200,00
15. October 2004204,00
14. October 2004199,00
13. October 2004212,00
12. October 2004226,00
11. October 2004226,00
08. October 2004223,00
07. October 2004220,00
06. October 2004221,00
05. October 2004218,00
04. October 2004215,00
01. October 2004214,00
dateBrass MS 58, 1st processing level
30. September 2004216,00
29. September 2004209,00
28. September 2004210,00
27. September 2004211,00
24. September 2004208,00
23. September 2004206,00
22. September 2004205,00
21. September 2004204,00
20. September 2004202,00
17. September 2004200,00
16. September 2004201,00
15. September 2004197,00
14. September 2004197,00
13. September 2004197,00
10. September 2004198,00
09. September 2004195,00
08. September 2004199,00
07. September 2004196,00
06. September 2004197,00
03. September 2004195,00
02. September 2004197,00
01. September 2004197,00
dateBrass MS 58, 1st processing level
31. August 2004200,00
30. August 2004200,00
27. August 2004199,00
26. August 2004199,00
25. August 2004195,00
24. August 2004198,00
23. August 2004196,00
20. August 2004196,00
19. August 2004196,00
18. August 2004196,00
17. August 2004200,00
16. August 2004203,00
13. August 2004199,00
12. August 2004197,00
11. August 2004196,00
10. August 2004193,00
09. August 2004194,00
06. August 2004200,00
05. August 2004203,00
04. August 2004202,00
03. August 2004202,00
02. August 2004203,00
dateBrass MS 58, 1st processing level
30. July 2004203,00
29. July 2004201,00
28. July 2004197,00
27. July 2004193,00
26. July 2004195,00
23. July 2004192,00
22. July 2004194,00
21. July 2004193,00
20. July 2004194,00
19. July 2004196,00
16. July 2004198,00
15. July 2004194,00
14. July 2004192,00
13. July 2004196,00
12. July 2004194,00
09. July 2004189,00
08. July 2004189,00
07. July 2004190,00
06. July 2004191,00
05. July 2004191,00
02. July 2004189,00
01. July 2004189,00
dateBrass MS 58, 1st processing level
30. June 2004187,00
29. June 2004188,00
28. June 2004189,00
25. June 2004190,00
24. June 2004188,00
23. June 2004186,00
22. June 2004185,00
21. June 2004190,00
18. June 2004190,00
17. June 2004190,00
16. June 2004189,00
15. June 2004185,00
14. June 2004188,00
11. June 2004194,00
09. June 2004194,00
08. June 2004194,00
07. June 2004196,00
04. June 2004196,00
03. June 2004198,00
02. June 2004202,00
01. June 2004202,00
dateBrass MS 58, 1st processing level
28. May 2004199,00
27. May 2004198,00
26. May 2004197,00
25. May 2004197,00
24. May 2004195,00
21. May 2004201,00
20. May 2004190,00
19. May 2004190,00
18. May 2004187,00
17. May 2004190,00
14. May 2004196,00
13. May 2004197,00
12. May 2004197,00
11. May 2004195,00
10. May 2004193,00
07. May 2004197,00
06. May 2004200,00
05. May 2004197,00
04. May 2004199,00
03. May 2004199,00
dateBrass MS 58, 1st processing level
30. April 2004197,00
29. April 2004198,00
28. April 2004199,00
27. April 2004204,00
26. April 2004205,00
23. April 2004204,00
22. April 2004205,00
21. April 2004208,00
20. April 2004216,00
19. April 2004215,00
16. April 2004209,00
15. April 2004207,00
14. April 2004207,00
13. April 2004206,00
08. April 2004206,00
07. April 2004209,00
06. April 2004207,00
05. April 2004212,00
02. April 2004213,00
01. April 2004214,00
dateBrass MS 58, 1st processing level
31. March 2004211,00
30. March 2004214,00
29. March 2004215,00
26. March 2004211,00
25. March 2004210,00
24. March 2004211,00
23. March 2004208,00
22. March 2004212,00
19. March 2004211,00
18. March 2004211,00
17. March 2004213,00
16. March 2004209,00
15. March 2004209,00
12. March 2004206,00
11. March 2004203,00
10. March 2004200,00
09. March 2004197,00
08. March 2004202,00
05. March 2004203,00
04. March 2004204,00
03. March 2004213,00
02. March 2004209,00
01. March 2004209,00
dateBrass MS 58, 1st processing level
27. Febuary 2004205,00
26. Febuary 2004203,00
25. Febuary 2004202,00
24. Febuary 2004198,00
23. Febuary 2004197,00
20. Febuary 2004196,00
19. Febuary 2004195,00
18. Febuary 2004200,00
17. Febuary 2004190,00
16. Febuary 2004188,00
13. Febuary 2004185,00
12. Febuary 2004183,00
11. Febuary 2004180,00
10. Febuary 2004179,00
09. Febuary 2004180,00
06. Febuary 2004180,00
05. Febuary 2004181,00
04. Febuary 2004180,00
03. Febuary 2004178,00
02. Febuary 2004179,00
dateBrass MS 58, 1st processing level
30. January 2004263,00
29. January 2004261,00
28. January 2004257,00
27. January 2004257,00
26. January 2004255,00
23. January 2004252,00
22. January 2004254,00
21. January 2004255,00
20. January 2004255,00
19. January 2004260,00
16. January 2004253,00
15. January 2004251,00
14. January 2004250,00
13. January 2004251,00
12. January 2004248,00
09. January 2004251,00
08. January 2004246,00
07. January 2004245,00
05. January 2004248,00
02. January 2004247,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2003168,00
29. December 2003169,00
23. December 2003166,00
22. December 2003165,00
19. December 2003163,00
18. December 2003161,00
17. December 2003162,00
16. December 2003162,00
15. December 2003162,00
12. December 2003161,00
11. December 2003162,00
10. December 2003161,00
09. December 2003161,00
08. December 2003163,00
05. December 2003163,00
04. December 2003163,00
03. December 2003162,00
02. December 2003162,00
01. December 2003159,00
dateBrass MS 58, 1st processing level
28. November 2003158,00
27. November 2003156,00
26. November 2003156,00
25. November 2003157,00
24. November 2003155,00
21. November 2003153,00
20. November 2003153,00
19. November 2003157,00
18. November 2003159,00
17. November 2003161,00
14. November 2003162,00
13. November 2003164,00
12. November 2003164,00
11. November 2003163,00
10. November 2003164,00
07. November 2003165,00
06. November 2003167,00
05. November 2003166,00
04. November 2003163,00
03. November 2003162,00
dateBrass MS 58, 1st processing level
31. October 2003162,00
30. October 2003160,00
29. October 2003157,00
28. October 2003157,00
27. October 2003154,00
24. October 2003154,00
23. October 2003155,00
22. October 2003158,00
21. October 2003157,00
20. October 2003157,00
17. October 2003156,00
16. October 2003155,00
15. October 2003153,00
14. October 2003152,00
13. October 2003151,00
10. October 2003147,00
09. October 2003148,00
08. October 2003146,00
07. October 2003146,00
06. October 2003147,00
03. October 2003145,00
02. October 2003145,00
01. October 2003143,00
dateBrass MS 58, 1st processing level
30. September 2003143,00
29. September 2003146,00
26. September 2003146,00
25. September 2003147,00
24. September 2003147,00
23. September 2003146,00
22. September 2003147,00
19. September 2003148,00
18. September 2003146,00
17. September 2003148,00
16. September 2003146,00
15. September 2003147,00
12. September 2003150,00
11. September 2003147,00
10. September 2003148,00
09. September 2003150,00
08. September 2003150,00
05. September 2003152,00
04. September 2003154,00
03. September 2003154,00
02. September 2003152,00
01. September 2003149,00
dateBrass MS 58, 1st processing level
29. August 2003149,00
28. August 2003149,00
27. August 2003148,00
26. August 2003151,00
25. August 2003151,00
22. August 2003151,00
21. August 2003147,00
20. August 2003147,00
19. August 2003147,00
18. August 2003144,00
15. August 2003145,00
14. August 2003144,00
13. August 2003144,00
12. August 2003146,00
11. August 2003147,00
08. August 2003149,00
07. August 2003147,00
06. August 2003147,00
05. August 2003148,00
04. August 2003147,00
01. August 2003153,00
dateBrass MS 58, 1st processing level
31. July 2003147,00
30. July 2003146,00
29. July 2003145,00
28. July 2003146,00
25. July 2003144,00
24. July 2003141,00
23. July 2003141,00
22. July 2003142,00
21. July 2003143,00
18. July 2003144,00
17. July 2003144,00
16. July 2003146,00
15. July 2003144,00
14. July 2003143,00
11. July 2003141,00
10. July 2003142,00
09. July 2003140,00
08. July 2003140,00
07. July 2003139,00
04. July 2003136,00
03. July 2003136,00
02. July 2003135,00
01. July 2003133,00
dateBrass MS 58, 1st processing level
30. June 2003135,00
27. June 2003137,00
26. June 2003135,00
25. June 2003135,00
24. June 2003136,00
23. June 2003137,00
20. June 2003136,00
18. June 2003136,00
17. June 2003133,00
16. June 2003131,00
13. June 2003133,00
12. June 2003133,00
11. June 2003134,00
10. June 2003134,00
06. June 2003135,00
05. June 2003136,00
04. June 2003135,00
03. June 2003136,00
02. June 2003135,00
dateBrass MS 58, 1st processing level
30. May 2003132,00
28. May 2003134,00
27. May 2003131,00
26. May 2003132,00
23. May 2003132,00
22. May 2003135,00
21. May 2003133,00
20. May 2003132,00
19. May 2003133,00
16. May 2003136,00
15. May 2003136,00
14. May 2003135,00
13. May 2003134,00
12. May 2003130,00
09. May 2003131,00
08. May 2003134,00
07. May 2003132,00
06. May 2003131,00
05. May 2003134,00
02. May 2003133,00
dateBrass MS 58, 1st processing level
30. April 2003135,00
29. April 2003136,00
28. April 2003135,00
25. April 2003135,00
24. April 2003134,00
23. April 2003136,00
22. April 2003136,00
17. April 2003138,00
16. April 2003140,00
15. April 2003140,00
14. April 2003138,00
11. April 2003137,00
10. April 2003137,00
09. April 2003137,00
08. April 2003139,00
07. April 2003141,00
04. April 2003138,00
03. April 2003137,00
02. April 2003137,00
01. April 2003136,00
dateBrass MS 58, 1st processing level
31. March 2003137,00
28. March 2003138,00
27. March 2003142,00
26. March 2003146,00
25. March 2003146,00
24. March 2003146,00
21. March 2003148,00
20. March 2003147,00
19. March 2003147,00
18. March 2003148,00
17. March 2003142,00
14. March 2003142,00
13. March 2003142,00
12. March 2003141,00
11. March 2003141,00
10. March 2003141,00
07. March 2003140,00
06. March 2003142,00
05. March 2003143,00
04. March 2003146,00
03. March 2003146,00
dateBrass MS 58, 1st processing level
28. Febuary 2003147,00
27. Febuary 2003148,00
26. Febuary 2003148,00
25. Febuary 2003146,00
24. Febuary 2003147,00
21. Febuary 2003143,00
20. Febuary 2003143,00
19. Febuary 2003141,00
18. Febuary 2003142,00
17. Febuary 2003142,00
14. Febuary 2003141,00
13. Febuary 2003143,00
12. Febuary 2003146,00
11. Febuary 2003148,00
10. Febuary 2003143,00
07. Febuary 2003144,00
06. Febuary 2003145,00
05. Febuary 2003144,00
04. Febuary 2003147,00
03. Febuary 2003149,00
dateBrass MS 58, 1st processing level
31. January 2003147,00
30. January 2003145,00
29. January 2003142,00
28. January 2003143,00
27. January 2003143,00
24. January 2003146,00
23. January 2003146,00
22. January 2003146,00
21. January 2003147,00
20. January 2003145,00
17. January 2003145,00
16. January 2003146,00
15. January 2003147,00
14. January 2003144,00
13. January 2003143,00
10. January 2003145,00
09. January 2003145,00
08. January 2003144,00
07. January 2003144,00
06. January 2003143,00
03. January 2003144,00
02. January 2003139,00

Brass MS 58, 1st processing level

dateBrass MS 58, 1st processing level
30. December 2002142,00
24. December 2002145,00
23. December 2002145,00
20. December 2002144,00
19. December 2002145,00
18. December 2002147,00
17. December 2002147,00
16. December 2002147,00
13. December 2002149,00
12. December 2002150,00
11. December 2002150,00
10. December 2002149,00
09. December 2002150,00
06. December 2002153,00
05. December 2002154,00
04. December 2002153,00
03. December 2002155,00
02. December 2002157,00
dateBrass MS 58, 1st processing level
29. November 2002154,00
28. November 2002154,00
27. November 2002150,00
26. November 2002151,00
25. November 2002151,00
22. November 2002151,00
21. November 2002151,00
20. November 2002149,00
19. November 2002146,00
18. November 2002146,00
15. November 2002146,00
14. November 2002145,00
13. November 2002145,00
12. November 2002145,00
11. November 2002145,00
08. November 2002144,00
07. November 2002147,00
06. November 2002149,00
05. November 2002147,00
04. November 2002150,00
dateBrass MS 58, 1st processing level
31. October 2002148,00
30. October 2002148,00
29. October 2002148,00
28. October 2002150,00
25. October 2002149,00
24. October 2002148,00
23. October 2002148,00
22. October 2002148,00
21. October 2002146,00
18. October 2002147,00
17. October 2002146,00
16. October 2002142,00
15. October 2002142,00
14. October 2002141,00
11. October 2002142,00
10. October 2002141,00
09. October 2002141,00
08. October 2002141,00
07. October 2002141,00
04. October 2002140,00
02. October 2002143,00
01. October 2002141,00
dateBrass MS 58, 1st processing level
30. September 2002140,00
27. September 2002143,00
26. September 2002143,00
25. September 2002143,00
24. September 2002143,00
23. September 2002142,00
20. September 2002142,00
19. September 2002144,00
18. September 2002145,00
17. September 2002148,00
16. September 2002148,00
13. September 2002147,00
12. September 2002148,00
11. September 2002150,00
10. September 2002148,00
09. September 2002146,00
06. September 2002141,00
05. September 2002141,00
04. September 2002141,00
03. September 2002143,00
02. September 2002144,00
dateBrass MS 58, 1st processing level
30. August 2002144,00
29. August 2002144,00
28. August 2002146,00
27. August 2002145,00
26. August 2002147,00
23. August 2002146,00
22. August 2002146,00
21. August 2002144,00
20. August 2002144,00
19. August 2002143,00
16. August 2002144,00
15. August 2002142,00
14. August 2002140,00
13. August 2002142,00
12. August 2002142,00
09. August 2002144,00
08. August 2002144,00
07. August 2002144,00
06. August 2002144,00
05. August 2002141,00
02. August 2002142,00
01. August 2002145,00
dateBrass MS 58, 1st processing level
31. July 2002147,00
30. July 2002146,00
29. July 2002147,00
26. July 2002144,00
25. July 2002144,00
24. July 2002144,00
23. July 2002149,00
22. July 2002147,00
19. July 2002148,00
18. July 2002151,00
17. July 2002152,00
16. July 2002151,00
15. July 2002153,00
12. July 2002156,00
11. July 2002155,00
10. July 2002155,00
09. July 2002156,00
08. July 2002156,00
05. July 2002158,00
04. July 2002157,00
03. July 2002156,00
02. July 2002158,00
01. July 2002157,00
dateBrass MS 58, 1st processing level
28. June 2002155,00
27. June 2002156,00
26. June 2002152,00
25. June 2002155,00
24. June 2002153,00
21. June 2002156,00
20. June 2002157,00
19. June 2002158,00
18. June 2002160,00
17. June 2002161,00
14. June 2002159,00
13. June 2002163,00
12. June 2002162,00
11. June 2002163,00
10. June 2002163,00
07. June 2002164,00
06. June 2002166,00
05. June 2002164,00
04. June 2002160,00
03. June 2002162,00
dateBrass MS 58, 1st processing level
31. May 2002160,00
30. May 2002162,00
29. May 2002162,00
28. May 2002161,00
27. May 2002160,00
24. May 2002162,00
23. May 2002159,00
22. May 2002159,00
21. May 2002160,00
17. May 2002162,00
16. May 2002164,00
15. May 2002165,00
14. May 2002164,00
13. May 2002163,00
10. May 2002164,00
08. May 2002166,00
07. May 2002162,00
06. May 2002163,00
03. May 2002165,00
02. May 2002165,00
dateBrass MS 58, 1st processing level
30. April 2002168,00
29. April 2002169,00
26. April 2002168,00
25. April 2002167,00
24. April 2002169,00
23. April 2002172,00
22. April 2002172,00
19. April 2002167,00
18. April 2002170,00
17. April 2002169,00
16. April 2002168,00
15. April 2002167,00
12. April 2002168,00
11. April 2002169,00
10. April 2002169,00
09. April 2002170,00
08. April 2002170,00
05. April 2002172,00
04. April 2002172,00
03. April 2002174,00
02. April 2002176,00
dateBrass MS 58, 1st processing level
28. March 2002176,00
27. March 2002175,00
26. March 2002174,00
25. March 2002172,00
22. March 2002174,00
21. March 2002175,00
20. March 2002176,00
19. March 2002177,00
18. March 2002175,00
15. March 2002172,00
14. March 2002170,00
13. March 2002174,50
12. March 2002173,00
11. March 2002174,00
08. March 2002174,00
07. March 2002174,00
06. March 2002172,00
05. March 2002172,00
04. March 2002173,00
01. March 2002168,00
dateBrass MS 58, 1st processing level
28. Febuary 2002169,00
27. Febuary 2002167,00
26. Febuary 2002168,00
25. Febuary 2002164,00
22. Febuary 2002164,00
21. Febuary 2002167,00
20. Febuary 2002165,00
19. Febuary 2002168,00
18. Febuary 2002169,00
15. Febuary 2002171,00
14. Febuary 2002173,00
13. Febuary 2002169,00
12. Febuary 2002167,00
11. Febuary 2002168,00
08. Febuary 2002169,00
07. Febuary 2002170,00
06. Febuary 2002171,00
05. Febuary 2002170,00
04. Febuary 2002172,00
01. Febuary 2002173,00
dateBrass MS 58, 1st processing level
31. January 2002166,00
30. January 2002165,00
29. January 2002166,00
28. January 2002168,00
25. January 2002168,00
24. January 2002166,00
23. January 2002162,00
22. January 2002162,00
21. January 2002163,00
18. January 2002165,00
17. January 2002166,00
16. January 2002164,00
15. January 2002164,00
14. January 2002163,00
11. January 2002163,00
10. January 2002164,00
09. January 2002164,00
08. January 2002164,00
07. January 2002162,00
04. January 2002157,00
03. January 2002150,00
02. January 2002153,00